검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 10

        1.
        2017.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        According to the nuclear safety act, the enforcement regulations and the notification of the atomic energy commission, a preliminary decommissioning plan must be submitted at all domestic nuclear facilities. In accordance with this preliminary decommissioning plan, it is required to prepare eleven items from the outline of the decommissioning plan of the nuclear facility to the fire protection. Currently, the nuclear fuel cycle facility operated by the Korea Atomic Energy Research Institute (KAERI) consists of a radioactive waste form test facility (RWFTF), a post irradiation examination facility (PIEF), a radioactive waste treatment facility (RWTF), and a radioactive waste storage facility (RWSF). The decommissioning strategies, decommissioning methods and dismantling activities of these nuclear facilities are described in this paper. The scope of decommissioning, the dismantling method, the final conditions of the site, the management of radioactive waste, and the cost of decommissioning are established in the decommissioning strategy. The decommissioning schedule, work order, basic principle and technical feasibility are determined at the method of decommissioning. The disinfection techniques and activity plans for facilities and sites contaminated with radioactive materials are described at the dismantling activity. Therefore, this paper describes the concept of decommissioning of the nuclear fuel cycle facilities and prepares a preliminary decommissioning plan to be prepared afterwards.
        4,200원