The amount of waste water generated from the domestic sources is consistently increasing in proportion to economic growth, and the conventional activated sludge process is widely being used for general waste water treatment. But the ministry of environment becomes stringthent treatment standards of N and P (less than 20mg/L of N, 2mg/L of P) to prevent the eutrophication of lake water, and therefore highly advanced treatment technology is required not only in the existing treatment plants where the activated sludge process is being used, but also in newly constructed treatment plants for the treatment of N and P. This study is aimed at highly operating the engineering technology method was developed by domestic to eliminate N and P at the same time. Experiments were conducted in the treatment plant located in Yong In city. The bioreactor was started from the principal equipment for the elimination of N and P and the elimination of organic compounds. It consists of an internal recycle piping from the end of the aerobic tank to the anoxic tank and external recycle piping from the final settling basin to the denitrification tank. By experiment of 4 types separate inflow of waste water to the denitrification tank and the anaerobic tank, and changes in staying time at the anoxic tank and the aerobic tank, the elimination of organic compounds in each type and the relationship in the efficiency between the elimination of N and P were researched.
The purpose of this research was to investigate applicative possibility of field. Pilot-scale experiments were conducted, at outdoor temperature, HRT 10hour, IR(Internal Recycle) 150% and used 2.8㎥ Reactor. External carbon source was varied 80 to 120 mg/L. When External carbon source and Alkalinity were injected to the B3 pilot plant, the removal efficiencies of COD and BOD were not decreased. Nitrification rate were 5.95, 5.40, 4.08 mgNH4+-N/gSS/d during operation periods and denitrification rate was 3.12mgNO3--N/gSS/d. When we surveyed the relationship between loading rate of nitrogen and nitrogen removal quantity, this data was 0.949, B3 process will be possible application process of field.