검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 4

        1.
        2022.05 구독 인증기관·개인회원 무료
        The decommissioning of nuclear power plant (NPP) generates large amount of waste. Since the most of the concretes are slightly surface contaminated, the accurate characterization and regionspecific surface decontamination are important for the efficient waste management. After the effective surface decontamination and separation, most of the concrete waste from decommissioning of NPP can be classified as a clearance waste. Various surface characterization and decontamination technologies are suggested. The mechanical technologies are simple and offers direct application. The laser-based technologies offer efficient separation and surface contamination. The high price, however, hesitates the application of the process. The nitro-jet technology, which is based on the evaporation of liquid nitrogen, allows the effective decontamination. However, the high price and uncertainty of large are application hinders the practical application in NPP decommissioning. In this paper, various technologies for characterization, handling, treatment, etc., will be discussed. The advantages and disadvantages of the technologies will be discussed, in terms of practical applications.
        4.
        2019.12 KCI 등재 SCOPUS 구독 인증기관 무료, 개인회원 유료
        Large amounts of concrete waste are likely to arise from the decommissioning of a Kori-1 nuclear power plant. Several studies have been conducted on decommissioning concrete waste in recent decades, however, they have been limited to contaminated concrete issues or were small pilot-scale experiments. This study constructed two industrial-scale models of on-site concrete waste management for clean as well as contaminated concrete. To evaluate the performance of both the models, simulations were conducted using the Flexsim software. The concrete particle size distribution of Kori-1 and concrete processor properties based on widely used construction equipment were used as sources of input data for the simulations. It was observed that it may take over two years to complete the on-site concrete management processes owing to the performance of existing processors. In addition, it was demonstrated that it is essential to identify bottlenecks in the system and enhance the performance of the relevant processors to avoid delays of the decommissioning schedule. Our results suggest that this novel approach can contribute to developing schedules or expediting delayed activities in the Kori-1 decommissioning project.
        4,800원