검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 5

        1.
        2012.03 구독 인증기관 무료, 개인회원 유료
        Recent projects for transferring Public Office buildings and estimation of appropriate construction expense are highly important for both government and construction firms. Moreover, estimation and management of construction expense can be regarded as extremely important duties for effective execution of a national budget as nation’s finance is invested in the Public office building projects progressed by the government. To progress one project for Public office building, not only the organization demanding the project but also an investment screening organization, a budget-managing organization, a feasibility assessment institution and many other related organizations participate in the project and a lot of decisions arisen from the project operation are made on the basis of construction expenses calculated for relevant stages. And estimation of rational construction expense is also critical for designers in order to create design within the fixed budget simultaneously with securing the quality and efficiency of structures to the maximum. Therefore this research suggested an improvement process to analyze problems in current construction expense management process and to administer the construction expenses effectively.
        4,000원
        2.
        2010.03 구독 인증기관 무료, 개인회원 유료
        Recently expanding market for largely scale construction projects, cost management of construction project have been increasingly recognized as an important factor responsible for the project success. But public organizations have been continuously operating the same methods as before in cost estimating, so it raise an issue of reliability for estimated cost. Therefore, this study present a highly reliable model that makes preliminary estimates based quantity data in early design stage. it enables engineers to efficiently manage total cost of project as well as partial cost estimating. This study develop a model of database that is created with historical data conducted by government offices. The model proposed can estirnate a cost for RC Structure in schematic design stage, and it is applied to CBR+GA logics to explore best similar cases. In case of estimating methods used to previous research, it is based on actual cost data. Due to the cost estimating compensated by inflation rate vary in market economic conditions, it will follow as an inevitable consequence of reliability problem. It needs to find better way to ensure accuracy through quantity database. Also, This study has been conducted in attempts to verify the reliability of preliminary estirnation. It is checked for the feasibility of presented model with P-National Tax Service Project aside from the database.
        4,000원
        3.
        2009.09 구독 인증기관 무료, 개인회원 유료
        A prediction of construction cost in preparation for construction document is calculated in compliance with the unit cost in Public construction of korea. This eventually means that the reasonable construction cost of a building can't be determined before construction document phase cost of construction is settled and that the cost of construction is calculated inefficiently because of connection failing between cost management of detailed estimation and information. To improve those problems, therefore, Cost estimating model of structural building elements with approximate quantity survey method is suggested in this research. The model predict the amount of materials and the cost of construction on the basis of historical similar cases. In the direction of data analysis of this research, ratio statistics value is put to practical use to fit into the peculiarities of approximate estimate of each work trade on the basis of actual data amount of materials of historical cases. In addition, the construction phase is connected through the result of a approximate estimate sorted by elements, details work trade.
        4,000원
        4.
        2009.03 구독 인증기관 무료, 개인회원 유료
        When managers predict exact construction cost at early stage and design phase, they can reduce construction cost in a more efficient way than to predict at construction stage. But present of public construction cost estimation and management almost after the construction documents design phase. Therefore, construction cost management in the early stage and schematic design phase to generally use approximate estimating is not correct. Accordingly, this study analyze problem of current cost estimating method and a concrete cost plans make using case information of actual cost to analyze in schematic design phase. Possible to check going on the suitable design, this study conducts the preliminary research for the development of cost estimating model.
        3,000원
        5.
        2019.06 KCI 등재 서비스 종료(열람 제한)
        항로표지사고는 항로표지의 신뢰성을 저하시키고, 관리자는 추가적인 업무가 부여되며, 이용자는 항해 중 부담감을 가지게 되는 등 모두에게 불편을 초래하는 사회적 비용(경제적 손실)이 발생하게 된다. 이러한 항로표지사고로 인한 경제적 손실을 추정하기 위해 선행연 구에서는 항로표지사고의 사회적비용 추정모델을 생산손실비용, 행정비용, 위험비용의 합으로 제안하였으나, 위험비용의 추정에 대한 적절한 연구결과를 제시하지 못하였다. 따라서 본 연구에서는 선행연구에서 제시한 추정모델을 보완하여, 부산청 관할해역에서 최근 10년간 (2008-2017년) 발생한 항로표지사고 249건에 대한 사회적비용을 산출하였다. 즉, 항로표지 사고의 위험비용은 항로표지가 비시장재화이므로 조건부가치측정법을 이용하여 산출하였다. 그 결과, 10년간 항로표지사고의 사회적비용은 생산손실비용 31억원(25.38%), 행정비용 17억원 (13.62%), 위험비용 75억원(61.01%) 등 총 124억원으로 추정되었다.