검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 2

        1.
        2023.09 KCI 등재 구독 인증기관 무료, 개인회원 유료
        This study uses FMECA (Failure Modes, Effects, and Criticality Analysis) and HAZOP (Hazard and Operability), which are widely applied in industrial areas, among risk assessment methods, and applies them to the same system. While FMECA evaluates system failure conditions and analyzes risks, HAZOP evaluates the system comprehensively by evaluating operational risks that may occur based on system parameters. According to data released by the Ministry of Land, Infrastructure and Transport, as of December 2021, the length of roads in Korea is 113,405 km, and the repair of guardrails that have expired must be fixed urgently in terms of traffic safety. Replacing all of these guardrails with new ones requires a very large cost, but if the guardrails are repaired with a vehicle equipped with the G-Save method, carbon emissions are reduced, the repair period is shortened, and great economic benefits can be obtained. However, risk assessment for guardrail coating vehicles has not been done so far. Focusing on this point, this study aims to evaluate the risk of these coating vehicles and describe the results. Finally, we found that the Risk Priority Numbers(RPN) in the FMECA risk assessment were greatly reduced, and 6 risk factors from HAZOP risk assessment and actions were taken.
        4,000원
        2.
        2012.09 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Risk Assessment to list possible safety disasters and their probability and severity is the starting point for effective safety management on construction project site. However, the safety managers in owners, construction supervisors, contractors, and sub-contractors still have difficulties in judging the priorities of safety activities and preparing responses to each potential safety disasters. Therefore, this study aimed to suggest a systematic method in assessing safety risk prior to commencement with the agreement of stakeholders. FMECA(failure mode effects and criticality analysis) was selected as a main assessment tool and it was modified according to the characteristics of construction projects and trades. Each risk is, firstly, evaluated with occurrence probability, possible loss and impacts to projects, and detections, and then risk priority number(RPN) is calculated. Subsequently, the managers of each stakeholder discuss the types, timing, and responsibilities of responses as a group decision-making process.
        4,000원