Kori Unit 1 nuclear power plant is a pressurized water reactor type with an output of 587 Mwe, which was permanently shut down on June 18, 2017. Currently, the final decommissioning plan (FDP) has been submitted and review is in progress. Once the FDP is approved, it is expected that dismantling will begin with the secondary system, and dismantling work on the primary system of Kori Unit 1 will begin after the spent nuclear fuel is taken out. It is expected that the space where the secondary system has been dismantled can be used as a temporary storage place, and the entire dismantling schedule is expected to proceed without delay. The main equipment of the secondary system is large and heavy. The rotating parts is connected to a single axis with a length of about 40 meters, and is complexly installed over three floors, making accessibility very difficult. A large pipe several kilometers long that supplies various fluids to the secondary system is installed hanging from the ceiling using a hanger between the main devices, and the outer diameter of the pipe is wrapped with insulation material to keep warm. In nuclear secondary system decommissioning, it is very important to check for radiation contamination, establish and implement countermeasures, and predict and manage safety and environmental risks that may occur when cutting and dismantling large heavy objects. So we plan to evaluate the radiation contamination characteristics of the secondary system using ISOCS (In- Situ Object Counting System) to check for possible radioactive contamination. According to the characteristics results, decommissioning plans and methods for safe dismantling by workers were studied. In addition, we conducted research on how to safely dismantle the secondary system in terms of industrial safety, such as asbestos, cutting and handling of heavy materials and so on. This study proposes a safe decommissioning method for various risks that may occur when dismantling the secondary system of Kori Unit 1 nuclear power plant.
Chemical decontamination of primary systems in a nuclear power plant (NPP) prior to commencing the main decommissioning activities is required to reduce radiation exposure during its process. The entire process is repeated until the desired decontamination factor is obtained. To achieve improved decontamination factors over a shorter time with fewer cycles, the appropriate flow characteristics are required. In addition, to prepare an operating procedure that is adaptable to various conditions and situations, the transient analysis results would be required for operator action and system impact assessment. In this study, the flow characteristics in the steady-state and transient conditions for the chemical decontamination operations of the Kori-1 NPP were analyzed and compared via the MARS-KS code simulation. Loss of residual heat removal (RHR) and steam generator tube rupture (SGTR) simulations were conducted for the postulated abnormal events. Loss of RHR results showed the reactor coolant system (RCS) temperature increase, which can damage the reactor coolant pump (RCP)s by its cavitation. The SGTR results indicated a void formation in the RCS interior by the decrease in pressurizer (PZR) pressure, which can cause surface exposure and tripping of the RCPs unless proper actions are taken before the required pressure limit is achieved.
국내 가동원전 중 2-루프 가압경수로인 고리1호기는 약 40년 운전한 후, 2017년 6월 18일 영구정지되었다. 영구정지된 고리 1호기는 주요 해체작업을 수행하기전에 계통내 선량률을 저감시켜 작업자피폭을 최소화하기 위한 계통제염을 수행할 예정이다. 일반적으로, 계통제염 범위는 원자로압력용기, 가압기, 증기발생기, 화학 및 체적제어계통, 잔열제거계통 및 원자로 냉각재계통 주요배관을 포함한다. 이러한 계통 및 기기 등을 효율적으로 제염하기 위해서는 제염과정에서 원자로냉각재계 통내 유동특성을 평가할 필요가 있다. 계통제염을 위해 순환유량을 제공하는 방법은 다양하나, 본 논문에서는 잔열제거펌프 운전에 따른 고리1호기 원자로냉각재계통내 유동특성을 평가하였다. 잔열제거펌프를 이용한 계통제염은 원자로냉각재 내 유량의 불균형을 초래하여 계통내 기기 및 배관 등에 불순물을 침적시켜 제염이 효율적이지 않다는 것으로 평가되었다.