검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 3

        1.
        2016.06 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Peak load rate(i.e., maximum daily flow/average daily flow) has not been considered for industrial water demand planning in Korea to date, while area unit method based on average daily flow has been applied to decide capacity of industrial water treatment plants(WTPs). Designers of industrial WTPs has assumed that peak load would not exist if operation rate of factories in industrial sites were close to 100%. However, peak load rates were calculated as 1.10~2.53 based on daily water flow from 2009 to 2014 for 9 industrial WTPs which have been operated more than 9 years(9-38 years). Furthermore, average operation rates of 9 industrial WTPs was less than 70% which means current area unit method has tendency to overestimate water demand. Therefore, it is not reasonable to consider peak load for the calculation of water demand under current area unit method application to prevent overestimation. However, for the precise future industrial water demand calculation more precise data gathering for average daily flow and consideration of peak load rate are recommended.
        4,000원
        3.
        2004.04 KCI 등재 서비스 종료(열람 제한)
        매립지는 도심부 혹은 내륙지역과는 달리 독특한 지형적 자연환경 특성을 가지고 있으며 내륙지역에 비해 낫은 기온, 강한 바람, 과다한 일사조건, 해염을 포함한 습기라는 기후적 악조건을 가지고 있다. 따라서 워터프런트를 개발할 경우는 매립에 따른 기후환경 특성을 상세하게 파악하여 적합한 개발 및 체계적인 유지관리가 필요하다. 워터프런트의 지형적, 기후적 특성을 충분히 검토하지 않고 개발을 추진한 경우 기후환경의 악화와 더불어 시설의 하자발생 및 부정확한 설비용량 산정에 따른 에너지비용 및 유지관리비용의 상승이 초래될 수 있다. 본 연구에서는 현재 매립ㆍ개발이 진행되고 있는 부산 신항만지역의 환경친화적 에너지 수급계획을 위하여 신항만지역의 표준기상데이터를 작성하고, 이를 바탕으로 현재 계획되어 있는 상업ㆍ업무시설과 주거시설을 대상으로 동적 최대 열부하계산을 실시하여 신항만지역 배후도시의 설비용량 산정을 위한 기초자료를 제시하였다.