검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 3

        1.
        2014.04 서비스 종료(열람 제한)
        Existing tunnel and digging and construction of the center tunnel wall construction process was, including constructing additional a 2-Arch Tunnel is disadvantageous the workability and workday. In addition, the central wall (girder) due the complex waterproof, multiple, as leaks and has a structure plan requires proper Maintenance Methods.
        2.
        2014.04 서비스 종료(열람 제한)
        Railroad concrete track is continuously supporting structure for repeated impact loads. Fine cracks which occurred in the early stage of the train operation, gradually expanded depending on the tonnage increases, and the function of the slab track is reduced. And, occurrence of track irregularity, worsening of ride comfort and interfere with the safe operation of trains would be follows. Therefore, management and maintenance of the initial crack is very important, railroad maintenance overhaul organizations detected twice a year or more the cracks and paint it, displays the location and severity, the type of cracks, width and length by creating a developed view. Each year much maintenance works is required for checking the crack of concrete trackbed and sleepers.
        3.
        2013.04 서비스 종료(열람 제한)
        In this study, for estimating the loss and damage ratio of maintenance monitoring sensor of foreign railroad tunnel, the loss and damage condition of maintenance monitoring which is installed and operated in the foreign tunnel structure is researched and analyzed. The total loss and damage ratio at the elapsed time of 5-6 years after installation is 13.9% in the Channel Tunnel of England. Therefore, it is reasonable to reflect that the total loss and damage ratio of maintenance monitoring sensor of railroad tunnel is estimated provisionally 15% on design, and hence the study of the loss and damage ratio with the number of elapsed years in long-term by the measurement category will be needed.