Spent Fuel Pool Island (SFPI) is a spent nuclear fuel storage pool that operates independently of existing nuclear facilities to safely manage SNF and minimize maintenance costs during the nuclear decommissioning process. Since the radiation controlled area can be dismantled before transporting SNF to a dry storage facility, the overall decommissioning period can be shortened, and the risk of occupational exposure during dismantling is reduced. In the US, various nuclear power plants have introduced SFPI for this reason. In this paper, to analyze the economic feasibility of application of SFPI to nuclear power plants to be decommissioned, several scenarios are established in consideration of the decommissioning plan and schedule, SFPI and dry storage facility application schedule. Cost and benefit list (SFPI application cost, SNF management cost, SNF dry storage cask cost, etc.) for each alternative were derived, and economic analysis was conducted by applying the Net Present Value (NPV). As a result of the analysis, it is found that the application of SFPI during decommissioning is economically effective as the NPV showed a positive number even when uncertainty was taken into account.
국내 원자력발전소에서는 사용후핵연료 저장용량의 확대를 위해 사용후핵연료저장조에 조밀저장대를 설치하고 있지만 한 빛원전은 2024년에 포화가 예상된다. 또한 10개의 원자력발전소가 2029년까지 설계수명에 도달하게 된다. 하지만 원전운영 과 해체를 위한 국내 사용후핵연료 관리정책은 아직 결정되지 않은 상황이다. 미국의 경우 원전해체시 사용후핵연료를 중간 저장시설 또는 영구처분장으로 이송하기 전까지 임시적으로 독립된 사용후연료저장조(이하 ‘SFPI’) 방식을 운영하는 사례가 있다. SFPI는 원전해체시 운전정지 후 사용후핵연료를 저장하는데 있어서 방사선 노출 저감, 운영비용 절감, 안전성 보강 등 의 효과를 기대할 수 있다. 따라서 이 논문에서는 미국의 SFPI 운영경험, 시스템, 적용규정 등에 대한 사례연구를 수행하였 다. 결론적으로 SFPI 국내 적용을 위해서는 사용후핵연료저장 계통의 설계변경 범위 및 예상 소요비용 확정, 원전 해체계획 에 설비개선 계획 반영제출, 주기적안전성평가(PSR) 방법 등을 활용한 안전성 평가(운영기간 10 년), 설계변경을 위한 운영 변경허가 신청, 규제기관 심사 및 허가 취득, 설계변경 수행, 규제기관의 확인점검, SFPI 운영을 위한 교육 및 시운전, SFPI 운영 및 정기검사, SFPI 해체 등의 절차가 필요하다.