검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 2

        1.
        2021.06 KCI 등재 구독 인증기관 무료, 개인회원 유료
        PURPOSES : This study aims to deduce the appropriate interval of cross passage for small vehicle exclusive roads within urban underground roads to ensure safety. METHODS : This study evaluated evacuation safety by fire and evacuation simulations. The simulation was applied to a passenger-caronly urban underground road, which was performed in the entry/exit section with a gradient of 6.0% and the mainline on level grade. The values of the variables for the simulations were determined to be close to the actual situation based on of the statistics and the results of previous studies. In the simulation scenario, the cross passage interval was visible. The evacuation safety was evaluated by comparing the “evacuation completion time” and the “smoke diffusion time.” Evacuation safety can be desirable when the evacuation completion time is shorter than the smoke diffusion time. RESULTS : According to the results of the simulation, the desirable cross passage interval is 180 m for the entry/exit sections with a 6% gradient in passenger-car-only tunnels. This criterion may be prolonged to an interval of 210 m and a width of 0.9 m for the construction reduction, based on the results of the statistical analysis. CONCLUSIONS : According to the results of this study, the risk indices of the “Small Vehicles Road Tunnel Fire Safety Facility Installation and Management Guidelines” may be supplemented by the tunnel class and the gradient of the entry/exit section. In addition, the guideline may provide an improved interval of evacuation cross passage and the width of the cross passage door by the safety index.
        4,000원
        2.
        2014.11 KCI 등재 서비스 종료(열람 제한)
        본 논문에서는 경북 구미시 봉곡천에 최근 건설된 다기능어도를 대상으로 SAP2000으로 구조 해석하기 위한 변수를 R/C Slab, R/C+S/C Slab 및 지하이동통로 규격(가로×세로)을 1m×0.2m, 1m×0.4m, 1m×0.6m와 유속 0.8m/s, 1.2m/s, 1.6m/s으로 구분하여 해석한결과와 봉곡천 설계식을 비교하여 안정성을 검토하였다.봉곡천의 설계식 보다 R/C+S/C Slab 타입이 지하이동통로 출구부는 휨모멘트와 최대응력은 각각 28~54%, 26~50%, 측벽은 24~47%,17~31%, 상부슬래브인 경우도 10~27%, 4~20% 적게 나타났다. 따라서 최대응력과 휨모멘트가 R/C+S/C Slab 타입이 구조 안정성이 확보되는 것으로 나타났기 때문에 지하통로는 휨모멘트와 최대 응력이 27%, 25%, 측벽은 24%, 15% 상부슬래브는 14%, 10%의 보완이 요구되는 것으로 판단된다.이러한 결과는 지하이동통로 규격이 봉곡천 규격과 동일한 1m×0.4m일 때가 1m×0.2m, 1m×0.6m 보다 안정성이 가장 유리한 것으로확인되었다. 또한 해석 및 분석 결과를 근거로 다기능어도 시공 시 기본 자료로 활용이 기대된다.