검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 3

        3.
        2019.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        PURPOSES: This study developed a new backfill method for mini trenching. The purpose of this study is to evaluate the performance of the new backfill method in the field. METHODS: In this study, asphalt pavement was created to verify mini trenching. Trenching test sections were then made in various trench widths in the asphalt pavement. The trench widths were 10 cm, 15 cm, 20 cm, and 25 cm. For the trenching test section, a general backfill method and new backfill method (2-layer SCB) were devised and applied. To evaluate the test section, a vehicle loading test and FWD (falling weight deflectometer) test were performed. RESULTS : In the vehicle loading test, the duct vertical strain of the general section was up to 22 times larger than that of the 2-layer SCB section. According to the results of the FWD test, the D0 deflection of the 2-layer SCB section was smaller than that of the general section. These results indicate that 2-layer SCB has a good structural performance. With the use of FWD data, BLI (base layer index) and MLI (middle layer index) were analyzed. BLI is an indirect index for evaluating base layer. The BLI of the 2-layer SCB section was smaller than that of the general section, because the bottom layer (cellular mortar) of the 2-layer SCB is superior to that of the general section. MLI, on the other hand, is an indirect index for evaluating subbase layer. As the trench width increases, MLI increases. The MLI of the 2-layer SCB section was smaller than that of the general section. These results indicate that the damage is relatively greater when the trench width increases and that the 2-layer SCB strengthens a relatively weakened subbase. CONCLUSIONS: In this study, the performance of the 2-layer SCB was analyzed. The results of the study showed that good performance was obtained when 2-layer SCB was applied to a mini trenching section.
        4,200원