Recently, the floor construction method of buildings is rapidly being replaced by the steel deck construction method of factory products from the past cast-in-place formwork method in order to shorten construction period, reduce labor costs, and improve constructability. In this study, the bending capacity of a newly developed lattice integrated rib-type deck plate that is economical and constructible was evaluated through a simple beam test. As a result of the experiment, the lattice integrated rib-type deck installed by adding rib to the existing flat deck had excellent initial rigidity and maximum load-bearing ability, confirming the feasibility of practical use. In addition, the test specimen in which the tensile rebar is not integrated with the lattice and deck has very low initial stiffness, which is insufficient to support the load at the construction stage, and new details need to be developed to overcome this.
강-콘크리트 합성구조의 성능을 확보하기 위해서는 전단연결재가 설치된 전단연결부에 대한 전단강도 분석이 필수적이다. 전단연결부의 전단거동을 효율적으로 예측하기 위하여, 전단연결부의 push-out test에 대한 유한요소해석을 수행하였다. 유한요소해석에는 범용 프로그램인 ABAQUS가 사용되었으며, 대상 실험체는 Y형 전단연결재가 적용된 강-콘크리트 전단연 결부이다. 유한요소해석에서는 대상 실험체를 구성하는 재료들의 비선형성을 고려하였고, 비선형해석의 수렴문제를 해결하기 위하여 준정적해석을 사용하였다. 본 연구에서 수행된 유한요소해석 결과를 바탕으로 하중-변위곡선과 전단강도를 기존 실험결과와 비교한 결과, 준정적해석을 이용한 유한요소모델은 기존 실험결과를 잘 반영하는 것을 확인하였다.
This study focuses on the push-out tests performed for verifying the performance of Y-type perfobond rib shear connectors. The end bearing resistance of the Y-type perfobond rib shear connector may be determined by the sizes of rib height and rib width. Therefore, in this study, the end bearing resistance is analyzed according to the rib widths and rib heights.
This study shows experimental loading tests on monolithic and spliced hybrid PSC girders with Y-type perfobond rib shear connectors. The main purposes of the study are to investigate the static behaviors of joint parts in the spliced girder and load-resisting capacity of Y-type perfobond rib shear connectors in steel-concrete composite connections. Two specimens (monolithic and spliced girder) with 10.3m length were manufactured and tested. As results of the loading tests, static it is expected that the spliced girder can be utilized effectively in practical design. In addition, Y-type perfobond rib shear connectors can be applied adequately in steel-concrete composite connections.