Many production management systems for increasing productivity, minimizing inventory, keeping due dates and maximizing use of resources have been proposed, and GT, MRP and JIT are frequently used among these systems. The three systems have merits and demerits through comparing with each other. Because each system has mutual dependence, a hybrid production system Is necessary for using their merits maximally. In this study, a hybrid production system is designed by combining GT, MRP and JIT, which is suitable in the domestic production system and it is presented as followings. -. Basic research works for G7, MRP and JIT. -. Comparison and analysis are carried out for each system.- . The hybrid production system is designed. -. The hybrid production system is developed.