In this study, prediction of later-age compressive strength of ultra-high strength concrete, based on the accelerated strength of concrete cured in hot water was investigated. Comparing other acceleration method, hot water curing method is relatively easy and intuitive to use in the real construction site. The amount of time for evaluation of the concrete strength using the hot water curing method in KS and JIS is too long to predict the strength of the ultra-high strength concrete that are used in the tall building structure. For that reason, curing temperature of 40, 50, 60˚c 3 levels were examined to shorten the amount of time for the evaluation of the strength. As a result, the feasibility of the three days hot water curing method was confirmed.