A cable structures have the advantage that cover a large space without column but it is very sensitive to deal with shape control because of its flexibility. Especially, location of control member and needed elongation of member are important things. Therefore, the purpose of this paper is studied on displacement control technique for pre-stressed cable structures by force method considering order of control.