The purpose of this study was to experimentally evaluate seismic performance of connection of modular system. As a result of experiment study, two specimens did not show the strength reduction and brittle fracture at connection until 2% story drift. Thus, requirements for intermediate moment frame(IMF) was satisfied in two specimens.