Korea Research Reactor 1&2 (KRR-1&2), Korea’s first research reactor, began dismantling in 1997. As of 2022, the demolition of general areas such as offices has been completed, and contaminated areas such as reactor rooms remain. On the other hand, construction waste generated in contaminated areas of nuclear facilities cannot be disposed of as general industrial waste. It is predicted that about 5,000 tons of construction waste will be generated if the contaminated area of KRR-1&2 is demolished. In this study, the application plan for the demolition of contaminated area of KRR-1&2 was reviewed through a review of laws and cases related to domestic and overseas disposal. The only method for disposing of construction waste in contaminated areas that can be applied in Korea is clearance in accordance with Nuclear Safety Commission Notice No. 2020-06. In addition, there has been no case of demolishing large-scale nuclear facilities in Korea. Therefore, there are limitations in domestic laws and standards to be applied to the dismantling of contaminated areas of KRR-1&2. The IAEA and the United States specify comprehensive matters such as optimization of radiation protection and minimization of waste products. The EU recommends demolition after decontamination by removing contaminated areas before demolition of buildings. It also presents three options for reuse, recycling, and disposal of buildings and building waste. In particular, in the case of Germany, detailed radioactivity measurement methods for deregulation of buildings and building waste are presented in accordance with the EU’s guidelines. As a result of synthesizing this, it is judged that the EU and Germany building clearance plan will be suitable for domestic application.