검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 21건

        1.
        2007.09 KCI 등재 구독 인증기관 무료, 개인회원 유료
        송서일, 정혜진, 이보근
          This study define the concepts of port logistics service by investigating various elements of port logistics service and grouping them in six attributes using a Data Mining technique. The QFD (Quality Function Deployment) technique is applied to measure
        4,000원
        2.
        2005.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        송서일, 박현규, 정혜진
        This paper is designed a VSI X-CRL synthetic control chart in aspect of economy. We found the optimal sampling interval and various control limit factors under various cost parameters using cost function, proposed Lorenzen and Vance. Optimal design parame
        4,000원
        3.
        2004.04 구독 인증기관 무료, 개인회원 유료
        송서일, 박현규, 정혜진
        This paper presents a economic design of synthetic control chart that is an VSI(variable samlping interval) X control chart and conforming run length chart. Computer simulation is carried out for comparing performance of developed control chart with X-CRM synthetic chart. We found that optimal parameter of suggested chart for minimize quality cost. And then a comparison and analysis between synthetic VSI X-CRL chart and X-CRM synthetic chart in the economic aspect. Then VSI X-CRL chart consistently produces smaller quality cost than X-CRM synthetic chart.
        4,000원
        4.
        2003.09 KCI 등재 구독 인증기관 무료, 개인회원 유료
        송서일, 조영찬, 박현규
        Statistical process cintrol is intended to assist operators of a stable system in monitoring whether a change has occurred in the process, and it uses several control charts as main tools. In design and use of control chart, it is rational that probabilit
        4,200원
        5.
        2002.10 구독 인증기관 무료, 개인회원 유료
        송서일, 조영찬, 박현규
        In this study, we establish bootstrap control limits for robust M-estimator chart by applying the bootstrap method, called resampling, which could not demand assumptions about pre-distribution when the process is skewed and/or the normality assumption is doubt. The results obtained in this study are summarized as follows : bootstrap M-estimator control chart is developed for applying bootstrap method to M-estimator chart, which is more robust to keep Type Ⅰ error when process contain contaminate quality characteristic.
        4,000원
        8.
        2001.03 KCI 등재 구독 인증기관 무료, 개인회원 유료
        송서일, 조영찬, 박현규
        4,000원
        10.
        2000.07 KCI 등재 구독 인증기관 무료, 개인회원 유료
        송서일, 손한덕
        4,000원
        13.
        1999.03 KCI 등재 구독 인증기관 무료, 개인회원 유료
        김진수, 김홍준, 송서일
        4,300원
        14.
        1997.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        김홍준, 송서일
        4,000원
        15.
        1996.09 KCI 등재 구독 인증기관 무료, 개인회원 유료
        배홍석, 이만웅, 송서일
        4,300원
        16.
        1991.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        이종근, 송서일
        4,600원
        17.
        1991.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        송서일, 박영호
        4,300원
        18.
        1990.06 KCI 등재 구독 인증기관 무료, 개인회원 유료
        박주영, 송서일
        4,000원
        19.
        1989.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        박주영, 송서일
        4,000원
        1 2