검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 2

        1.
        2006.03 KCI 등재 구독 인증기관 무료, 개인회원 유료
        This study aims to identify and analyze the factors that influenced the construction of London Eye which was led by private groups, including characteristics in progress, differentiated value in design, the combination of technology and design, and construction costs. The results of this study were the followings. 1) London Eye provides a new construction method for a landmark in the downtown in that the architects became the clients of the project which might have been hoarded, procuring the construction costs and completing it by themselves. 2) London Eye presents a space utilization method where undeveloped spaces in the downtown are used in three-dimensions by erecting a structure on the river with a minimum land. 3) The process of design, production and erection is propelled the realization of technical intention design with one system and from at the initial stage, the participation of the engineer where the designer is equal with you must accompany. 4) London Eye is endowed with strong shape by a circle in design concept, which is the simplest geometrical figure, and it provides organic relationship between the past and the present by utilizing historical elements in various ways. 5) The construction was completed through four phases including idea phase, promotion phase, turn-key contract phase, and design-build phase. The most critical factor to the success is derived from the direct contact with Involved companies from the production phase. 6) In a project facing many challenges in terms of technology, the design-build method proves to be a more effective method than turn-key contract in that it may more allocate risks and enable coherent implementation of the core concept in design. The organization for the design-build method was composed of three phases including general affairs, responsible contracting by sector, and cooperative system by sector. Since that was a new concept structure, high-level contractors who hadn't had existing cooperative relationships with one another formed new cooperative relationship, while collaborating companies who had long cooperated led the responsible contracting and sub-cooperative system, which resulted in reduction of risks and time. 7) The major factors to change design were the design characteristics, derived from a technically great combination, and the opening time. 8) A new erection method was applied to London Eye, a structure that overcame the limitation in land and period, and the process of installation demonstrated that it is an important value for the construction of a landmark in the city. 9) In spite of many visitors and tremendous operational income, the factors that London Eye fails to free itself from debts include the construction costs expended double than expected, and interest burden to the investments, which occurred in the course of procuring the costs. Absolute limit in time increased the construction costs, resulting in being a great obstacle in the course of operation.
        5,700원
        2.
        1987.06 KCI 등재 구독 인증기관 무료, 개인회원 유료
        열선유속계를 이용하여 디이젤 기관 연소실내의 한점에서 유속을 측정한 결과는 다음과 같은 결론을 얻었다. 1. 연소실내의 유동은 cylinder의 원주방향의 속도 성분이 크며, 유속변화는 밸브 timing과 피스톤 속도등에 밀접한 관계가 있다. 2. 유속은 흡입시부터 증가하여 압축행정중 흡입밸브가 닫히는 60˚ABDC에서 최대치를 갖고 이후 피스톤의 속도가 감소함에 따라 유속도 감소하여 팽창행정중 배기 밸브가 열리는 120˚ATDC에서 다시 증가하였다. 3. 평균유속은 shroud 밸브 사용시가 no shroud 밸브 사용시보다 낮지만 shroud 밸브 사용시 흡입행정에서 난류강도가 가장 크게 나타났다. 4. 90˚shroud 밸브 사용시가 120˚shroud 밸브 사용시보다 난류강도는 더 크고, 90˚shroud의 180˚위치에서 난류강도가 제일 크게 나타났다.(이 논문의 결론부분임)
        4,000원