        This paper develops a flow control block for a hydraulic system of a tunnel boring machine. The flow control block is a necessary component to ensure stability in the operation of the hydraulic system. In order to know the pressure distribution of the flow control block, the flow analysis was performed using the ANSYS-CFX. It was confirmed that the pressure and flow rate were normally supplied to the hydraulic system even if one of the four ports of the flow control block was not operated. In order to evaluate the structural stability of the flow control block, structural analysis was performed using the ANSYS WORKBENCH. As a result, the safety factor of the flow control block is 1.54 and the structural stability is secured.
        4,000원
        3.
        2017.04 서비스 종료(열람 제한)
        The tunnel structure is a structure supported by the ground rigidity around the tunnel excavation. Therefore, when tunnel excavation occurs, various problems arise in the tunnel when the ground stiffness is weak. These characteristics should be considered because the ground conditions in the design of tunnels are often different from the construction conditions investigated during tunnel construction
        4.
        2009.11 KCI 등재 서비스 종료(열람 제한)
        본 연구는 경부고속철도(대구~부산) 도심통과 노반신설 공사중 기존 부산지하철 1호선 및 부산지하철 2호선 구간에 대한 안정성에 관한 연구로서 현장조사를 실시하여 대상시설물의 외관상태, 품질상태 및 내구성능 등을 평가하고 MIDAS/GTS를 이용한 수치해석을 통해 대상시설물 및 본선터널의 안정성을 검토하는데 그 목적이 있다. 지하수위 하에서 터널이 시공되는 기본 메카니즘과 3차원 유한요소해석 응력-간극수압 연계해석을 수행한 후 라이닝 작용하중, 막장안정성, 지표침하 등 지하수와 터널굴착의 상호관계를 고찰하였다. 수치해석의 결과 1, 2호선의 최대침하, 부등침하, 라이닝응력 등은 허용치 이내이며 손상정도는 무시할 수 있는 정도의 경미한 것으로 나타나고 있다. 그러나 실제 터널 시공시 막장거동을 최소화하기 위하여 필요시 Pre-Grouting을 시행하여 터널 굴착시 터널내 유출수를 최소화하는 것이 필요할 것으로 판단된다.