검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 5

        5.
        2021.10 KCI 등재 구독 인증기관 무료, 개인회원 유료
        PURPOSES : For high driving performance and service life of cement concrete pavement, construction quality must be secured. The construction quality is to be measured after pavement construction, but in this case, it is difficult to improve construction quality. Therefore, it is necessary to develop a method for measuring and correcting the profile of the pavement and subbase so that the construction quality can be monitored immediately after construction. METHODS : The device that can measure the construction quality of cement concrete pavement has been developed. Through the experiment simulating the field situation, the profile of the pavement and subbase was measured and calibration method was developed. RESULTS : In the measured profile, an outlier by the sensor and noise by the sensor and vibration were measured, and a step-like profile was measured differently from the acture one. To remove outliers, the boxplot outlier removal method was applied by overlapping each data group. The noise were removed by a low pass filtering. And, it was calibrated to a profile similar to the acture one through the sampling interval adjustment and the weighted moving average method. CONCLUSIONS : The method that can measure and calibrate the profile that is almost identical to the actual one has been developed. Accordingly, it is expected that the performance of the pavement can be improved by accurately monitoring the construction quality immediately after construction.
        4,200원