        2.
        2017.03 KCI 등재 구독 인증기관 무료, 개인회원 유료
        PURPOSES:The objective of this study is to ascertain the curing period of cementless cold central plant recycled asphalt base-layer, using mechanical analyses and specimen quality tests on the field.METHODS :Cold central plant recycled asphalt base-layer mixture was produced in the plant from reclaimed asphalt, natural aggregate, filler for the cold mix, and the modified emulsion AP using asphalt mix design and plant mix design. In order to examine the applicability of the curing period during the field test, the international standards for the possibility of core extraction and the degree of compaction and LFWD deflection were analyzed. Moreover, Marshall stability test, porosity test, and indirect tensile strength test were performed on the specimens of asphalt mix and plant mix design.RESULTS :The plant production process and compaction method of cementless cold central plant recycled asphalt base-layer were established, and the applicability of the optical moisture content for producing the mixture was verified through the field test. In addition, it was determined that the core extraction method of the conventional international curing standard was insufficient to ensure performance, and the LFWD test demonstrated that the deflection converges after a two-day curing. However, the back-calculation analysis reveals that a three-day curing is satisfactory, resulting in a general level of performance of dense asphalt base-layer. Moreover, from the result of the specimen quality test of the asphalt mix design and plant mix design according to the curing period, it was determined that the qualities satisfied both domestic and international standards, after a two-day curing. However, it was determined that the strength and stiffness after three-day curing are higher than those after a two-day curing by approximately 3.5 % and 20 %, respectively.CONCLUSIONS:A three-day curing period is proposed for the cementless cold central plant recycled asphalt base-layer; this curing period can be demonstrated to retain the modulus of asphalt-base layer in the field and ensure stable quality characteristics.
        4,000원
        3.
        2011.06 KCI 등재 구독 인증기관 무료, 개인회원 유료
        최근 10년간 전세계적으로 아스팔트 포장을 재활용하는 기술이 급속도로 확산되고 있으며 노후 아스팔트 포장을 폼드 아스팔트 또는 유화 아스팔트를 사용하여 현장에서 바로 100% 재활용하는 현장 상온 재생 아스팔트 포장기술이 다양하게 적용되고 있다. 특히, 아이오와 주에서는 교통량이 적은 지방도로에서 기존 포장의 수명을 연장 시켜주는 현장 상온 재생 아스팔트 공법을 많이 적용하고 있다. 일반적으로 현장 상온 재생 아스팔트 포장층은 수분의 침투나 교통하중으로부터 보호하거나 포장설계를 만족시키기 위해 가열 아스팔트 포장으로 덧씌우기를 한다. 일반적으로 현장 상온 재생 아스팔트 포장층 위에 가열 아스팔트 포장으로 덧씌우기 할 시기는 대부분에 감독자들은 일정한 양생기간 또는 최대 함수비에 근거하여 결정하고 있다. 따라서, 본 연구에서는 감독자가 최적에 덧씌우기 아스팔트 포장 시기를 결정할 수 있도록 현장 상온 재생 아스팔트 포장층의 현장 함수비를 간단하게 측정하여 덧씌우기 시기를 결정할 수 있는 수분 감소계수를 개발하는 것이다. 먼저, 현장 상온 재생 아스팔트 포장층의 함수비를 TDR 함수량계를 사용하여 측정하였고 현장 상온 재생 아스팔트 포장이 시공되는 기간 동안에 강우량, 대기온도, 습도, 바람속도 등 기상정보를 수집하였다. 마지막으로 현장 상온 재생 아스팔트 포장의 초기 함수비, 대기온도, 습도, 바람속도를 변수로 하는 수분 감소계수를 개발하였다. 실제 현장 상온 재생 아스팔트 포장에서 측정한 값을 사용하여 개발한 수분 감소계수는 감독자가 연속적으로 현장 상온 재생 아스팔트 포장층의 함수비를 측정하지 않고 최적의 덧씌우기 포장 시점을 결정할 수 있다.
        4,000원