After the study of Fujishima Gaijiro(1930), although it is common to see that the Tang-ruler(唐尺) was used in the construction of the Silla Sacheonwangsa temple(679), the basis of the discrimination of the construction measure and the detection of the unit length is not actually sufficient since conventional research was done before the excavation. The study was based on archaeological results, which was secured through the excavation research(2006∼2012) of the temple site in recent years, to determine the construction measure and try to detect the unit length. In the analysis of the measured value of the ruins, the numerical data were obtained through measurements on drawings of the ruins, the tendency of conversion measure’s number appearing by dividing each unit length of the Goguryeo-ruler(高句麗尺) and Tang-ruler within a certain range was compared from the Wansu-je(完數制) viewpoint. The research results are summarized as follows : 1)As a result of the analysis of the distance between the site’s center, the case that conversion Cheok’s(尺) number is converged to the unit of Jang(丈) within the range of unit length expresses three times more in Tang-ruler, and it is confirmed that a simple multiple relationship based on the unit of Jang is established between conversion Cheok’s number. 2)As a result of analysis of Bokan(梁間) of the each Corridor site and the measured value of the stonework ruins, it could be confirmed that appears overwhelmingly in the Tang-ruler when conversion Cheok’s number becomes an integer within the range of unit length. The results of the analysis are judged to be a clear basis for viewing the Tang-ruler as the construction measure of the Sacheonwangsa temple. 3)The estimated unit lengths of the construction measure that were obtained from the analysis of the distance between the site’scenter, the foundation stone center distance of the building site and the measured value of the stonework ruins are slightly different. There is a limit to the verification of the construction error about this, however it is difficult to specify, it is mentioned 294.37㎜ which is obtained from the analysis of the distance between the site’s center.
Recently in the construction business construction companies has been ordered to survive in the terriblly competitive environment. Aa a result, most of the project with low-priced contract needs a speedy progress during all construction period. For the last five years major incident frequently occurs and results in the death of 189 workers at major top 6 construction builders. In most recent 10 years, the cause of major incidents happened in construction company is the speedy construction work that is affecting on the safety management. To prevent these accidents in the speedy construction work, four factors were chosed and analysed such as the personnel/organization, the working budget, the subcontractor selection and the employee motivation. The head office taked the support plan and tested it at the pilot work site. It showed a reduced accident and the harmful factors can be eliminated. It should be able to apply to the field to secure safety and prevent accidents.
Recently in the construction business construction companies has been ordered to survive in the terriblly competitive environment. Aa a result, most of the project with low-priced contract needs a speedy progress during all construction period. For the last five years major incident frequently occurs and results in the death of 189 workers at major top 6 construction builders. In most recent 10 years, the cause of major incidents happened in construction company is the speedy construction work that is affecting on the safety management. To prevent these accidents in the speedy construction work, four factors were chosed and analysed such as the personnel/organization, the working budget, the subcontractor selection and the employee motivation. The head office taked the support plan and tested it at the pilot work site. It showed a reduced accident and the harmful factors can be eliminated. It should be able to apply to the field to secure safety and prevent accidents.