검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 5

        1.
        2023.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        In this study, we analyzed how the revenue water ratio(RWR) is affected by changes in conditions of the water supply area, such as the ratio of aging pipes, maintenance conditions, and revenue water. As a result of analyzing the impact of pipe aging and maintenance conditions on the RWR, it was confirmed that the RWR could be decreased if the pipe replacement project to improve the aging pipe ratio was not carried out and proper maintenance costs were not secured. It was also confirmed that an increase in the revenue water could be operated to facilitate the achievement of the project’s target RWR. In contrast, a decrease in the revenue water due to a population reduction could affect the failure of the target RWR. In addition to analyzing the causes of variation in the RWR, the calculation of estimated project costs was considered by using leakage reduction instead of RWR from recent RWR improvement project cost data. From this analysis, it was reviewed whether the project costs planned to achieve the target RWR of the RWR improvement project in A city were appropriate. In conclusion, the RWR could be affected by variations in the ratio of aging pipes, maintenance conditions, and revenue water, and it was reasonable to consider not only the construction input but also the input related to RWR improvement, such as leakage reduction, when calculating the project cost.
        4,800원
        2.
        2023.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        PURPOSES : Construction cost estimates are important information for business feasibility analysis in the planning stage of road construction projects. The quality of current construction cost estimates are highly dependent on the expert's personal experience and skills to estimate the arithmetic average construction cost based on past cases, which makes construction cost estimates subjective and unreliable. An objective approach in construction cost estimation shall be developed with the use of machine learning. In this study, past cases of road projects were analyzed and a machine learning model was developed to produce a more accurate and time-efficient construction cost estimate in teh planning stage. METHODS : After conducting case analysis of 100 road construction, a database was constructed including the road construction's details, drawings, and completion reports. To improve the construction cost estimation, Mallow's Cp. BIC, Adjusted R methodology was applied to find the optimal variables. Consequently, a plannigs-stage road construction cost estimation model was developed by applying multiple regression analysis, regression tree, case-based inference model, and artificial neural network (ANN, DNN). RESULTS : The construction cost estimation model showed excellent prediction performance despite an insufficient amount of learning data. Ten cases were randomly selected from the data base and each developed machine learning model was applied to the selected cases to calculate for the error rate, which should be less than 30% to be considered as acceptable according to American Estimating Association. As a result of the analysis, the error rates of all developed machine learning models were found to be acceptable with values rangine from 17.3% to 26.0%. Among the developed models, the ANN model yielded the least error rate. CONCLUSIONS : The results of this study can help raise awareness of the importance of building a systematic database in the construction industry, which is disadvantageous in machine learning and artificial intelligence development. In addition, it is believed that it can provide basic data for research to determine the feasibility of construction projects that require a large budget, such as road projects.
        4,000원
        3.
        2020.08 KCI 등재 SCOPUS 구독 인증기관 무료, 개인회원 유료
        본 논문에서는 고리 1호기 해체 비용 추정을 위해 외국 원자력발전소 해체 비용 데이터를 현가화한 후 원자력발전소 해체 비용 추정 회귀 분석모델을 개발하였다. 이 모델 개발에 사용된 데이터는 해체 또는 진행 중인 BWR 13기, PWR 16기의 해체 비용 데이터이다. 회귀 분석모델 도출을 위해, 해체 비용을 종속변수로 정하고, 해체 원전의 운전 특성을 반영할 수 있게 고 안된 Contamination factor와 해체 기간을 독립변수로 선정하였다. 빅데이터 분석 도구인 R language의 통계패키지를 이용 하여 회귀 분석모델을 도출하였다. 이 회귀 분석 모델을 적용하여 고리 1호기 해체 비용을 예측한 결과, 미화 663.40~928.32 백만 달러, 한화 약 7,828.12억~1조 954.18억 원이 소요될 것으로 예측되었다.
        4,600원
        4.
        2020.08 KCI 등재 구독 인증기관 무료, 개인회원 유료
        The estimation of heat source model is very important for heat transfer analysis with finite element method. Part I of this study used adaptive simulated annealing which is one of the global optimization algorithm for anticipating the parameters of the Goldak model. Although the analysis with 3D model which depicted the real situation produced the correct answer, that took too much time with moving heat source model based on Fortran and Abaqus. This research suggests the procedure which can reduce time with maintaining quality of analysis. The lead time with 2D model is reduced by 90% comparing that of 3D model, the temperature distribution is similar to each other. That is based on the saturation of heat transfer among the direction of heat source movement. Adaptive simulated annealing with 2D model can be used to estimate more proper heat source model and which could enhance to reduce the resources and time for experiments.
        4,000원
        5.
        2012.09 KCI 등재 구독 인증기관 무료, 개인회원 유료
        플라스틱 사출 제품은 다양한 가전제품과 하이테크 제품에 널리 사용되고 있다. 그러나 현재의 치열한 경쟁적 비즈니스 환경에서 플라스틱 사출 제품 제조업자들은 고객을 만족시키면서 경쟁력을 얻기 위하여 다른 경쟁자들보다 먼저 새로운 제품을 시장에 출시하고 신제품의 개발기간을 줄이기 위한 노력을 할 여유가 부족하다. 따라서 무한경쟁의 시장에서 살아남기 위해서는 제조업자들은 시장 마켓 점유를 빠르게 올리는 것과 동시에 제품의 가격 경쟁력을 가져야 한다. 특징기반
        4,000원