PURPOSES : This study sought ways to connect urban above ground roads and underground roads to utilize urban space more efficiently in the development of underground roads, which are currently under development in order to alleviate problems caused by oversaturated above-ground roads. A simulation analysis was performed to develop an operation strategy that connects above-ground and underground roads to prevent congestion in above-ground areas such as entrances and exits from transferring to underground roads as well as to present its effectiveness. METHODS : Traffic efficiency analysis according to the operation strategy of above ground and underground roads was conducted using VISSIM, a microscopic traffic simulation software. The functions implemented in VISSIM were collected to set effectiveness analysis indicators for each underground road operation strategy. The Shinwol-Yeoui Underground Road was selected as the spatial scope of this study, and a surrounding road network was constructed. In addition, full-scale simulation analysis preparations were completed by performing network calibration based on the actual traffic attribute data of underground and surrounding surface roads within the construction scope. Accordingly, a traffic efficiency evaluation analysis was conducted based on the underground road operation strategy. CONCLUSIONS : Information on the increase in traffic volume within the Shinwol-Yeoui underpass was collected every 15 min. The analysis was divided into an analysis of the traffic situation within the underpass through demand control when the service level reached level D and an analysis of when demand control was not performed. It was found that demand control was necessary for the Shinwol-Yeoui Underpass when the internal traffic volume reached 2,500 vehicles/h. In addition, to analyze the spread of traffic and congestion owing to the weaving phenomenon caused by lane changes in the underpass, an analysis was conducted to observe the traffic improvement effect when full lane changes are possible for the Shinwol-Yeoui Underground Road, which currently has some lane-change-permitted sections. The analysis showed that both the maximum traffic volume and average travel speed showed better results when lane changes were allowed, and the communication situation at Yeoui JCT was found optimal.
1. 세계 참깨 교역구조를 살펴보면, 전체 교역량이 증가하고 있는 상황에서, 수출국 중 에티오피아, 나이지리아, 부르키나파소, 탄자니아 등 아프리카 국가의 비중이 높아진 반면 중국, 미얀마 등의 비중은 큰 폭으로 하락하였다. 수입국 중 중국이 40% 이상의 수입시장 점유율을 차지하면서 주요 수출국에서 수입국으로 전락하였다.
2. 이러한 가운데 우리나라의 경우 국내 생산량이 감소하여 자급률이 하락하면서 최근 전체 소비량의 80% 이상을 수입에 의존하고 있으며, 여전히 중국으로부터의 수입 의존도가 매우 높다.
3. 장기적으로 세계 참깨 교역구조가 재편되면서 한국의 참깨 수입선도 다변화되고, 세계 수요 증가로 수입가격 상승의 영향을 받을 것으로 예상된다. 또한 수입 증가로 인해 TRQ 제도의 실효성, 국내 참깨산업의 위기 등의 문제가 동시에 제기될 수 있다.
1996년 천호대로 중앙버스전용차로가 시행된 이후 2008년 까지 8개 구간이 운영되고 있다. 그러나 중앙버스전용차로의 시행에 따른 직 간접적 영향권 내의 도로교통량 변화는 보고되지 않고 있다. 따라서 본 연구에서는 2004년 7월에 동시 개통된 3개 구간에 대한 사전 사후 도로교통량 변화를 분석하였다. 분석결과, 중앙버스전용차로 구간의 교통량은 중앙버스전용차로 개통 후(2004년 11월) 24.7%로 급격히 감소한 후, 개통 후 1년(2005년 11월) 1.4%로 안정화 된 것으로 분석되었다. 인접 우회도로 교통량은 개통 후(2004년 11월) 2.9% 감소한 후, 개통 후 1년(2005년 11월) 0.3%로 미비하게 증가하였다. 측정오차(±5%)를 고려하면 중앙버스전용차로 교통수요는 안정화 단계에 들어섰으며, 자동차 수요가 인접지역으로 우회하기 보다는 타 수단으로 전환된 것으로 판단된다.