검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 4

        1.
        2018.10 서비스 종료(열람 제한)
        This study sought to find a new diagnostic method. The drain hole temperature and the upstream water temperature change were measured for 1 year. The purpose of this study was to analyze the correlation between the temperature of the drain hole and the upstream temperature.
        2.
        2017.09 서비스 종료(열람 제한)
        In this study, in order to survey the concrete dam leakage use the Thermal Line Sensor (TLS) temperature monitoring instruments. The temperature monitoring locations are two drain hole of concrete dam and the upsteam water temperature of dam.
        3.
        2017.04 서비스 종료(열람 제한)
        Various methods were investigated to confirm the clogging of the drain hole of the concrete dam and recover it. The effects of drainage holes were investigated through re-drilling at the two locations.
        4.
        2017.01 KCI 등재 서비스 종료(열람 제한)
        Various methods were investigated to confirm the clogging of the drain hole of the concrete dam and recover it. The effects of drainage holes were investigated through re-drilling at the two locations.