Construction of the external wall framing using construction Gang-Form withstand the load of a full lift safety is very important in lifting rings can be a lot of Gang-Form is now fixed in the manner that you are welding and applied, but this study is based on the safety of the lifting ring to seek improvements were bolt type fixing method applied to the bonding type were part of the lifting ring in a manner fixed to the concrete surface and was applied in consideration of safety.
This paper has fabricated insulation gang-form adhering general gang-form to the polyisocyanurate board and analyzed type of members, temperature record by locations and strength development after placing the concrete, in order to ensure efficient concrete quality under cold weather. According to our test, we can see that general gang-form member with curing under the same conditions as the actual field has a trend of constantly decreasing concrete temperature regardless to surface or central area due to rapid outdoor air temperature reduction, while in the case of insulation gang-from I and II, temperature increased up to around 25℃ after 12 hours under rapid outdoor air temperature change and temperature distribution did not appear large separation according to hydration reaction measurement locations. In addition, results of measurement for temperature records on weak insulation area by types of gang-forms showed that the temperature record distribution on the form tie surface and horizontal bar surface of angle bar has generally similar trend as the temperature records on the surface of the insulation gang-form, while corner area of the insulation gang-form did not have large insulation effect. It is determined that it requires additional curing measure for the weak corner area of the insulation gang-form in the future.
This study is analyzing a member kind after placing concrete, the location-based temperature record, and the strength development, by making insulation gang-form with application of polyurethane form to general gang-form for securing efficient concrete quality in the condition of cold weather. According to our experimental results, the member of general gang-form with curing in the same condition as the actual field didn’t drop to under 3˚C until before 24 hours in the early part, but fell to under 0˚c from 36 hours later because a large rise in temperature caused by hydration reaction didn't occur. On the other hand, in case of insulation gang-form, the temperature on the surface and the central part didn't go down to under 3˚C before 12 hours in the early part and didn't fall to under it even until 72 hours after it while the peak temperature went up to 12˚C. Thus, it could be known to definitely have excellent insulation effect compared to space heating curing, which is generally performed on the spot. In comparison with space heating curing whose error in curing temperature is big every field, it is judged to likely have great effect on improvement in concrete quality given the work construction in cold weather and on early demolding in a cast during winter.
The integrated gang form system for outer insulation performs together the construction works of gang form and insulation. Therefore, this study presents the composition type of integrated gang form system and provides the several design cases for field application.