        PURPOSES : The Korea Expressway Corporation has been working on an early remodeling project for the Jungbu Expressway, to prepare techniques for the rehabilitation of the old CRCP. In this study, a literature review, field survey, and thickness design using MEPGD were conducted. This is to provide a procedure for the pre-treatment, or repair of the existing pavement in the JungBu Expressway. METHODS : To evaluate the pavement condition of the JungBu Expressway, the existing PMS data were analyzed, and field surveys were conducted for each pavement condition. The SMA overlay thickness design was performed using the pavement thickness design program (MEPGD). In addition, the repair procedure was reviewed considering the characteristics of the old CRCP in Korea. RESULTS : From the analysis of existing PMS, field surveys, and laboratory tests, it was discovered that the old CRCP condition of the Jungbu Expressway was not satisfactory. Using MEPDG, the SMA thicknesses for each scenario were proposed as 5, 8, and 10 cm. In addition, appropriate repair procedures for each distress type(punchpout, multiple repair, re-failure, failure of longitudinal joint, etc.) of damaged CRCP in Korea were proposed. CONCLUSIONS : For the remodeling project of the Jungbu Expressway, appropriate repairs should be performed for each type of distress in the old CRCP. In this study, an appropriate overlay thickness and pre-treatment method are suggested.
        4,000원
        2.
        2021.06 KCI 등재 구독 인증기관 무료, 개인회원 유료
        PURPOSES : Korea Expressway Corporation has been working on an early remodeling project for the Jungbu Expressway to prepare methods for the rehabilitation of the old CRCP(Continuous Reinforced Concrete Pavement). In this study, the distress of the old CRCP was classified, and the engineering properties of the core specimens for each failure type were evaluated. Based on the test results, the concrete conditions of the existing CRCP were evaluated. This provides a basis for the pre-treatment or repair of the existing CRCP in the JungBu Expressway. METHODS : To evaluate the pavement condition of the Jungbu Expressway, existing PMS(Pavement Management System) data were analyzed, and field surveys were conducted for each pavement condition. The longitudinal rebar depth, rebar spacing, horizontal crack, and pavement thickness were examined through core sampling and non-destructive testing. In addition, the core specimens were used to evaluate the compressive strength, chloride penetration test, chloride ion penetration resistance, and freeze-thaw resistance. RESULTS : From the analysis of existing PMS data, field surveys, and laboratory tests, it was found that the old CRCP condition of the Jungbu Expressway was not good. Various types of failures occurred, and horizontal cracks at the rebar location, upward rebar locations, and rebar corrosion were confirmed. In addition, the compressive strength was considerably high, but the durability-related index was judged to be poor. CONCLUSIONS : For the remodeling project of the Jungbu Expressway, appropriate repairs should be carried out for each type of distress in the old CRCP.
        4,000원