PURPOSES : Recently, interest in radioactive accidents has increased due to domestic and international nuclear power plant accidents. In particular, local residents' concerns are increasing due to safety issues such as radioactive leaks at the Hanbit Nuclear Power Plant in South Korea. As Gwangju Metropolitan City is not included in the emergency planning area set by the Nuclear Safety and Security Commission, there are significant limitations to establishing disaster prevention measures for nuclear power plant accidents. Considering the Fukushima and Hanbit nuclear power plant accidents, the improvement of Gwangju Metropolitan City's radioactive leak accident response manual is urgently required. This study aimed to establish disaster prevention measures to respond to nuclear power plant accidents in Gwangju Metropolitan City in the event of a Hanbit Nuclear Power Plant accident and to improve resident protection measures by estimating the arrival time of radioactive materials and radiation dosage through a nuclear power plant accident simulation. Additionally, we aimed to supplement the on-site action manual for radioactive leaks at the Hanbit Nuclear Power Plant. METHODS : This study focused on establishing disaster prevention measures centered on Gwangju Metropolitan City in the event of a major accident such as a radioactive leak at the Hanbit Nuclear Power Plant. Simulations were conducted assuming a major accident such as a radioactive leak, measures to improve resident protection were established by calculating the arrival time of radioactive materials and radiation dosage in the Gwangju area in the event of a nuclear power plant accident, and on-site response action manuals were supplemented in response to a radioactive leak. RESULTS : This study considered the concerns of local residents due to the Fukushima nuclear power plant accident and the Hanbit nuclear power plant failure, conducted a simulation to derive the impact on Gwangju Metropolitan City, and examined the effectiveness of an on-site response manual for radioactive leaks to derive improvement measures. CONCLUSIONS : In the event of an accident at the Hanbit Nuclear Power Plant in Gwangju Metropolitan City, insufficient portions of the on-site response action manual should be supplemented, and close cooperation with local governments within the emergency planning area should be ensured to respond to radioactive disasters. Therefore, based on the revised on-site response action manual for radioactive leaks, close cooperation and a clear division of roles among local governments will enable effective resident protection measures to be implemented in the event of a radioactive disaster.
During the decades after the Fukushima Daiichi Nuclear Power Station (FDNPS) accident, ambient dose rates have markedly decreased when compared to those at the early state of the accident. Government projects have been continuously conducted by surveying the ambient dose rate and radiocesium distributions. Airborne surveys using crewed helicopters and unmanned aerial vehicles (UAVs) are the best methods for obtaining an overall picture of the distribution. However, ground-based surveys are required for accurate measurements near the population. The differences between these methods include the knowledge of the post depositional behavior of radionuclides in land use. The survey results form the basis for policy decisions such as lifting evacuation zones, decontamination, and other countermeasures. These surveys contain crucial findings regarding post-accident responses. This paper reviews the survey methods of government projects and current situation around the FDNPS. The visualization methods and databases of ambient dose rates are also reviewed to provide information to the population.
The correlation between accident management plan and radiation emergency plan of Shin-Kori Units 3 and 4 was compared and analyzed from the point of view of the adequacy of facilities, equipments, organization and manpower which are necessary for the related emergency response. It was found the equipment of accident management plan and emergency response facility of radiation emergency plan had different technical contents and scope of application, so there was no risk of mutual conflict and overlapping functions. However, since the accident impact assessment code in accident management plan and computer program of radiation emergency plan were different, it was necessary to ensure the agreement or linkage of the evaluation between them. When a radiation emergency is issued in accident management plan, the composition and mission of the accident response organization were mostly consistent with the contents of the radiation emergency plan, but some corrections and improvement items were identified. Accident management plan specified that the disaster response safety center belonged to the emergency operations facility (EOF), but the radiation emergency plan did not mention it at all. The main tasks of disaster response safety center were the movement, arrangement and connection of mobile emergency response facilities, on-site construction of other emergency response facilities, and on-site road restoration. According to the accident management plan, the movement, arrangement, and connection of mobile facilities (i.e., mobile generators, mobile pumps, multi-purpose communication relay facilities), which were considered very important for the prevention and mitigation of serious accidents, were under the supervision of the disaster response safety center. It was stipulated that the operation was carried out with the cooperation of a regular emergency organization, and that the start, operation and stop of mobile equipments were to be performed under the supervision of the emergency operation team supported by the regular emergency organization. Since this organization structure and assignment of duties could not be confirmed in radiation emergency plan, it was necessary to revise and improve the radiation emergency plan for the successful operation of mobile equipments and to link them with the accident management plan.
사용후핵연료의 효율적인 관리를 위하여 원자력연구소에서 개발중인 사용후핵연료 차세대관리 종합공정(ACP)은 공정타당성연구 단계를 마치고 이의 실증을 위한 - type핫셀 건설 단계에 이르렀다. 핫셀의 설계에 앞서 사용후핵 연료를 취급하게 되는 과정에서 발생할 수 있는 방사능에 대한 환경영향평가를 정상운전 시와 사고발생 시로 나누어 수행하였다. 평가에 필요한 자료들은 공정의 개념설계 보고서와 최근 연구소부지 기상 테이터 및 부지특성 자료를 바탕으로 하였으며 기존의 유사한 시설에 대한 평가방법을 참조하였다. 각 핵종별 발생량과 방출량을 계산하여 피폭선량을 계산하였으며 평가결과 원자력법관련 규제기준과 핫셀이 위치하게 되는 IMEF 건물의 안전성분석 기준보다 매우 안전한 결과를 얻어 시설 운영에 대한 안전성을 확보하였다.