검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 2

        1.
        2018.05 구독 인증기관·개인회원 무료
        In recent years, pavement distresses have been caused by diverse factors such as spalling, deterioration of repaired sections, blow-up, and alkali aggregate reaction due to changing climate environment of a concrete pavement and its construction and maintenance conditions (supply of materials, increase in use of de-icers, etc,). As a leading repair method for deteriorated concrete pavements, partial-depth repair is implemented in accordance with guidelines of material properties for joints of a concrete pavement and field application evaluation systems, but still some of the repaired sections become deteriorated again at an early stage due to poor construction quality and failure of response to environmental impacts. Distresses that can be corrected with partial-depth repairs are largely divided into those of repair materials and of the existing pavement bonded to repair materials, and combined distress of repair materials and the existing pavement. Although re-repair methods should be different by distress type and scale than conventional pavement repair methods, appropriate repair methods and guidance for re-repairs have not been in place so far, and therefore currently, re-repair practices follow the existing manual of partial depth repairs. Therefore, this study evaluated concrete bond characteristics by removing method and repair scope for an experimental section of frequently distressed pavements to determine a re-repair scope and method for deteriorated partial depth repair sections of concrete pavement, the number of which has increased over time.
        2.
        2017.10 KCI 등재 구독 인증기관 무료, 개인회원 유료
        PURPOSES : The purpose of this study is to suggest the construction and quality control method for the re-repair of a deteriorated partial depth repair for sections of Portland cement concrete pavement. METHODS : An experimental construction was conducted to extend the repair width for removing an existing repair section. A removal method was used to ensure early performance for a deteriorated partial depth repair section. Bond strength and split tensile strength were measured at the near vertical interface layer between the existing pavement and repair material. The area was analyzed for various conditions such as the extended repair area and the removing method of the existing repair section. RESULTS : As a result of analysis of bond strength and split tensile strength, the bonding performance of a milling removed section was improved over a cutting and hand breaker removed section. The bond strength was analyzed to increase slightly as the extended repair width for removing the existing repair section increased. The split tensile strength did not show a clear relationship to an increased extended repair width of an existing removed repair section. CONCLUSIONS: The milling removal method should be applied in the removal of existing deteriorated partial depth repair sections. The extended repair width for a re-repair section should be wider than the existing partial depth repair with at least a 75-mm length and width for the bond strength and the split tensile strength.
        4,000원