In this Study, the dynamic movement of concrete bounded by steel-band on reinforced-concrete column the external sides of which were reinforced by steel band has been evaluated as a case of post-tension engineering. Total five different experimental objectives were made and the rate of deformation of each binding concrete depending on different binding power forced to steel-band and locations of primary roots and different interval distances between reinforcing materials been checked.
In this Study, Manufacturing 9 Specimens objects for the experiment, the attaching strength between concrete and each reinforcing rod has been reviewed with variables like the different binding effect depending on the number of primary root, concrete-installing direction, location of primary root, and binding power loaded to steel band. The last destructed phase of experimented objectives and their attaching strengths between concrete and reinforcing rod have been evaluated.
최근 손상된 부재를 원상으로 회복하면서 보강할 수 있는 프리스트레스 보강공법에 대한 관심이 고조되고 있다. 손상된 부재를 보강하기 위한 기존의 포스트텐션공법은 구조부재에 추가적인 손상을 발생시킬 수 있으므로, 인접부재에 손상을 주지 않는 새로운 형태의 부분프리스트레스공법에 관한 개발 및 성능평가가 요구된다. 본 연구에서는 새로운 외부포스트텐션공법 중 하나인 아웃케이블 공법에 대한 구조성능을 평가하기 위해 휨 보강된 연속보에 관한 실험적 연구를 수행하였다. 그 결과, 기존 포스트텐션과 아웃케이블공법의 주요 파괴모드는 균열이 고르고 넓게 분포한 휨파괴의 형태를 나타냈다. 그리고, 초기의 휨균열 시 강성 및 철근항복 시 강성, 항복하중, 최대하중에서 유사한 거동특성을 보임으로써 두 공법에 의한 보강효과는 동일한 결과를 보였다.