After it was reorganized as the rural center revitalization project recently, there is an opinion that the nature of the project was changed to solve long-time aspired projects of some districts unlike various projects according to the previous project purposes. Therefore, this study analyzes the current status of revitalization project plans and operation monitoring to make rural center villages, establishes plans that can be applied to the rural center village revitalization project and suggests the improvement plans for monitoring. With the necessity of connectivity with centrality analysis for long-term and sustainable growth of the rural center revitalization project, the analysis on the 8 districts' centrality analysis and the function of the master plan were compared and analyzed, but there is not enough interrelation. Regarding the consulting methods for weak districts to activate facility operation after the project is implemented, the field consulting performed by the collaboration of Gyeongsangnam-do government, Gyeongnam Rural Revitalization Support Center and Gyeongnam branch of Korea Rural Community Corporation shows 87.6% of satisfaction level, which indicates it is the most effective. Based on the above results, it is necessary to reinforce the methods on resident demand survey, dimension and the reflection process of the project when preliminary plans are established for effective implementation of the rural center village revitalization project. It is also necessary to revise relevant standards not to change preliminary plans excessively during the master plan establishment process, and to oblige preliminary investigation of experts. The joint monitoring and consulting systems of experts and local governments should be applied from the establishment stage of the master plan, so that it can be sustainable rural center village revitalization project.
The study intends to find out contents and impacts of rural development projects implemented by government in Ucheon myon-center village (Hoingseong-county) between 1989-1995. The projects in concern are Rural Industrial Estate Project(1989-90) and Rural Collective Village Project(1992-93), The restructuring of village plan introduced new construction and renewal of buildings that are required for a myon-center in general has to be. The study reveals some morphological patterns the village has and needs to be adjusted. As a conclusion, it proposes a conception of self-containment for a myon-center development. It is necessary that a project plan strategy should be based upon harmonious exploitation between old and new, flexible planning, and sense of technological alternatives.