This study analyzed the safety management efficiency through input-oriented BCC Model using DEA by making of Models, in which this study selected the number of staff affiliated with the construction site, number of staff members on the construction team, and number of safety personnel as Input Factor, along with the number of disaster victims and zero-accident accomplished hours as output elements, targeting 40-or-so apartment building construction sites which are being built by 3 domestic construction companies. As a result of efficiency, it was 0.643, the number of efficient DMU was 4. In the aspect of returns to scale, 21 construction sites(52.5%) found to be in a state of increasing returns while 14 construction sites(35%) was in a state of Decreasing returns. The reason for inefficiency was found to lie in technical factors in case of 30 construction sites(75%). Lastly, inefficient DMU is in need of 38.9 % and 66% reduction in site personnel and safety personnel. Based on study results, the 29 construction sites accounting for 72.5% of DMU for safety management efficiency evaluation object turned out to do inefficient safety management that doesn't fit the size of each company.
Labor required for managing and harvesting the oyster mushroom bed was evaluated. Although vinyl mulching cultivation method needs more hours for spawning, it saves more than 50% of labor for harvesting and managing of the mushroom bed. Harvesting hour of 1st-3rd flush in vinyl mulching method was 48~50% for Plerutus ostreatus and 36~41% for P. sajor-caju. Labor for bed management after harvesting in vinyl mulching method was also 38~50% for P. ostreatus compared to conventional method, and 20~35% for P. sajor-caju. Vinyl mulching is believed to be a very efficient method for saving labor in oyster mushroom cultivation.