Semiconductor processes are mainly divided into FAB process, package and test. The FAB process is promoting smart factories over a long period of time. The situation of the package and test process is manual, but there is a wafer testing process that prepares the latest topic "SmartFactory". The purpose of this study is to study the key variables for the completion of the material allocation scheduling system which will be the base environment of the smart factory in the wafer test process and to build the system based on the designed research model.
Recently, to improve operating efficiency with the higher in-line rate in automated production lines, a lot of cases of grouping machines and material handling system together to form a cluster has shown frequently. This article addresses the job allocati
본 연구에서는 철강 제조 공정에서 발생하는 생산 계획 문제를 설명하고 해결 방법을 제시한다. 철강 제품 중에서도 판재류(냉연, 아연도, 석도, 칼라 제품)를 생산하는 공정으로 연구 범위를 제한하고 적용하는 부분은 철강 공정의 스케줄링 분야를 배제한 생산 계획 분야만을 대상으로 한다. 특히, 철강 제조 공정의 생산 계획 문제들 중에서 가장 중요하게 고려되는 원료 충당 문제, 용량 할당 문제, Batched Annealing Furnace(BAF) 설비