These days, the Composite Slabs with Deep Deck plate was commonly used in domestic construction site, and, the application of the Slim Floor system was increased from the Enlargement and High-rise Building. But, Slim Floor system using the Deep Deck was shown safety problem caused by the deflection and local buckling in construction phase when used to more than 6m. Therefore, for solving the problem, the installation of the shores is essential. This study is realize the long span slab without shores from control the deflection through applied the pre-tensioning elements in CAP deck. In addition, by applying the pre-tensioning member as the tensile member of the CAP Deck slab, the pre-tensioning member for the shores tries to be used as the structural member. Accordingly, to determine the flexural performance of the CAP Deck slab through the pre-tensioning force in tensile member, and, the composite effect of the CAP Deck slab by the experiments.
These days, the Composite Slabs with Deep deck plate was commonly used in domestic construction site, and, the application of the Slim Floor system was increased from the Enlargement and High-rise Building. But, Slim Floor system using the deep deck was shown safety problem caused by the deflection and local buckling in construction phase when used to more than 6m. Therefore, for solving the problem, the installation of the shores is essential. This study is realize the long span slab without shores from control the deflection through applied the pre-tensioning elements in cap deck. In addition, by applying the pre-tensioning member as the tensile member of the Cap Deck composite slab, the pre-tensioning member for the shores tries to be used as the structural member. Accordingly, to determine the flexural performance of the Cap deck composite slab through the pre-tensioning force in tensile member, and, the composite effect of the cap deck composite slab by the experiments.
For each cable component in a cable dome structure, pre-tension is needed for stability of whole the structure. The summation of these pre-tension at each joint should be zero to achieve the self equilibrium structure. The first step in cable dome structure analysis is to find the ratio of pre-tension in each member which can produce a stable and structure on self-equilibrium. In this paper, a new method based on the basic principle of closed force polygon for equilibrium system is proposed for the determination of self-equilibrium mode of cable dome structure. A single layer cable dome and two multi layer type domes have been analyzed. The ratios of cable members are determined by the presented method, and check the validation of the results by numerical calculation.