검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 5

        2.
        2018.04 구독 인증기관·개인회원 무료
        Unlike column-to-beam connections in reinforced concrete frames, column-to-beam connections are generally of the same type. Vertical load (D.L + L.L) and horizontal load (wind load, seismic load) are not the same in the upper and lower flange stress history. In the case of beams bonded to synthetic CFT columns, the tensile force is transmitted through the steel pipe column, and the compressive force is transmitted to the filled concrete, so the seismic performance is excellent even if the column has a relatively thin cross section. Also, in case of beam the composite CFT column, tensile force is taken by the steel pipe column, and the compressive force is caught by the inner concrete, and the shape of the column joint can be changed. In this study, the stress distribution of buildings is investigated according to the size and characteristics of the building, and the load history of the upper and lower flanges according to the building type is checked to show the structural possibility of the Asymmetric Diaphragms joint.
        3.
        2016.06 KCI 등재 구독 인증기관 무료, 개인회원 유료
        These days, the Composite Slabs with Deep Deck plate was commonly used in domestic construction site, and, the application of the Slim Floor system was increased from the Enlargement and High-rise Building. But, Slim Floor system using the Deep Deck was shown safety problem caused by the deflection and local buckling in construction phase when used to more than 6m. Therefore, for solving the problem, the installation of the shores is essential. This study is realize the long span slab without shores from control the deflection through applied the pre-tensioning elements in CAP deck. In addition, by applying the pre-tensioning member as the tensile member of the CAP Deck slab, the pre-tensioning member for the shores tries to be used as the structural member. Accordingly, to determine the flexural performance of the CAP Deck slab through the pre-tensioning force in tensile member, and, the composite effect of the CAP Deck slab by the experiments.
        4,000원
        4.
        2016.04 구독 인증기관·개인회원 무료
        Deep-Deck usually used in long span structure for its larger section properties. but Deep-Deck has difficulties when the span is over 9m because of deflection. Deflection makes workers anxiety and Structural problems. So, Preload is used to the Deep Deck To control the the deflection of the deep deck which has 9m over. In this study, The Preloaded deep deck which has 9m was evaluated by Experments. Result of experiments, preloade and camber have proportional relation
        5.
        2015.04 구독 인증기관·개인회원 무료
        Recent increases in the use of Deep Deck, and the study was carried out much of the Deep Deck in the country. Research is the most studies on the behavior of the composite slab after the concrete is cured. However, the large stress is generated in the work load(150kgf/m2) at the time of pouring concrete. The Deep Deck does not satisfy the provisions of deflection during construction when applied to more than 6.0m span. In this study, installed a strand or reinforcing bar at the bottom of the Deep Deck. The pressing force of tension on the strand and rebar was carried out an experiment to produce an upward deflection of the Deep Deck. The loading experiment was carried out and the pressing force the UTM load.