In this study various investigations were carried out to analyze the causes of leakage for 20 years on the slope of the downstream side of the dam during the ○○ dam precision safety diagnosis. Analysis showed that the possibility of underground water flowing through the valley section of the mountain area extremely low, and that direct leakage of the reservoir's freshwater was confirmed as the main leakage path.