검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 5

        1.
        2019.10 서비스 종료(열람 제한)
        이 논문에서는 초기 지중응력(initial ground stress)으로 인한 수직터널의 균열 발생여부를 확인하기 위해 수압파쇄시험을 실시하였다. 수압파쇄시험 결과 터널 내 발생된 균열은 초기 지중응력과의 직접적인 연관성이 낮음을 확인하였다.
        2.
        2018.10 서비스 종료(열람 제한)
        In this study various investigations were carried out to analyze the causes of leakage for 20 years on the slope of the downstream side of the dam during the ○○ dam precision safety diagnosis. Analysis showed that the possibility of underground water flowing through the valley section of the mountain area extremely low, and that direct leakage of the reservoir's freshwater was confirmed as the main leakage path.
        3.
        2017.04 서비스 종료(열람 제한)
        Recently, there are few cases of the Precise Inspection for Safety and Diagnosis for transverse crack of CFRD. The presumable causes and characteristics of transverse cracks have suggested in this paper based on field survey and related NDT. Also, the maintenance of transverse crack of CFRD are proposed.
        4.
        2017.01 KCI 등재 서비스 종료(열람 제한)
        Recently, there are few cases of the Precise Inspection for Safety and Diagnosis for transverse crack of CFRD. The presumable causes and characteristics of transverse cracks have suggested in this paper based on field survey and related NDT. Also, the maintenance of transverse crack of CFRD are proposed
        5.
        2016.10 서비스 종료(열람 제한)
        Precise Inspection for Safety Diagnosis on 6 dams have been conducted by KISTEC. Spillway is the main structure of dam facilities especially in discharging water. Crack, leakage, and other defects have been inspected and analyzed depending on the purpose of spillway such as water gate or gate of intake.