6 sigma is a management innovation strategy which improves most of all managerial processes including transactional and project based operations such as marketing, purchasing, accounting, and construction. Even though 6 sigma is trying to solve problems from the customer’s viewpoint in the scientific manner, project leader feels some difficulties in implementation because of several reasons. Especially the difficulties are prevalent in construction site. This paper investigates the cause of the difficulties through questionnaires, analyzes the investigation results, and verifies the critical success factors of 6 sigma implementation. Factor analysis has been usually employed in reducing quantity of data and summarizing information chaos. In this study, several variables from questionnaires are grouped into just only four factors by the process of factor analysis. The critical success factors are extracted as project management system, implementation mechanism, site condition, and project ownership. Some ideas for each individual success factor are suggested, which are expected to be useful in successful implementation of 6 Sigma in construction site.
In this study, the evaluation criteria of performance and applicability is developed to rank the combinatorial technologies for SWG (Smart Water Grid) system using AHP (Analytic Hierarchy Process) method. Security, safety, solution, suitability and sustainability which are goals of SWG technology, are used as upper level hierarchy elements. And three detailed elements for each upper level hierarchy are adopted as the lower level hierarchy. The weighted value which represents the importance of each element, could be determined through questionnaires accomplished by groups of specialists who are engaged in relevant waster industry and research area. To assess the accuracy of the evaluation criteria developed in this study, a simulation on four decision alternatives for smart water grid was carried out as an evaluation. Consequently which showed 90 % of accuracy.
This paper is concerned with a six sigma application to non-manufacturing process. Based on the comparison to manufacturing process, non-manufacturing process has some specific characteristics. The main focus of this study is to introduce an empirical c
Service and administration departments in several companies adopt a program called Six Sigma, in order to make fundamental changes in Korea and abroad. This paper is concerned with a six sigma DMAIC road map for service and white-color management process. This road map consists of 13 steps which considers the employee's majors and characteristics of the business process, For commercial quality, the proposed road map were actually applied and successfully fulfilled to H company.
GE, as well as Motorola, TI, HP, ABB, and other companies, which have several suppliers from all of the world, adopted an innovation program called 6 Sigma, in order to make fundamental changes in the way they operated to fulfill customers' expectations and to evaluate and control their suppliers. Recently, as the 6 Sigma is being recognized as elementary and strategic means to improve the effectiveness of SCM(Supply Chain Management), there may be few business who does not operate 6 Sigma innovation program. Under such a circumstance, this study is aimed at expediting 6 Sigma pervasion by considering supplier evaluating scheme. It is recognized that this evaluating mechanism can be used as a great tool for the everlasting run of 6 Sigma in Korea.\
With the development of CNC(Computer Numerical Control) and communication technology, the connotation and functions of Distributed Numerical Control have been greatly enlarged. In this study, we develop and implement a Distributed Numerical Control system that has real time and multi-tasking operation capability for the machining cell with various NC(Numerical Control) and CNC machines. With the consideration of economy, generalization and extension, this system is interfaced with Shop Floor Control System, Machine Control System and Tool Preparation System using advanced networking method. In the implementation phase, we use the ORACLE DBMS (Database Management System) as the DBMS and Microsoft Visual C++ as the programming tools.
This paper considers automated storage and retrieval systems with double shuttle. We develop the travel time model based on the first come first service rule. We evaluate the performance of the double shuttle system working on the four command cycle.