검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 4

        1.
        2008.09 KCI 등재 구독 인증기관 무료, 개인회원 유료
        A preventive maintenance model, caller FNBM(α, δ, γ)model, is proposed to decide an optimal repair number under achieved availability requirements(r) along with taking two types of failures (repairable or irrepairable) into account. In this model, the current system is replaced by a new one in case when it doesn't meet the achieved availability requirement, even though it is repairable failure; Otherwise it is replaced in time of the first irrepairable failure. Assumed that the j-th failure is repairable with probability αj minimal repairs are allowed for repairable failure between replacements. Expected cost rate for preventive maintenance model is developed using NHPP(Non-Homogeneous Poisson Process) in order to determine the optimal number n*, also numerical examples are shown in order to explain the proposed model. Since the proposed FNBM(α, δ, γ)model includes Park FNBM model(1979) and Nakagawa FNBM(p)model(1983) this proposed model is thought to be better than previous model, especially for weapon system which requires availability as primary parameter.
        4,000원
        2.
        2006.10 KCI 등재 구독 인증기관 무료, 개인회원 유료
        This study expands limitation of OASIS(Optimal Allocation of Spares for Initial Supports) program, which calculates CSP(Concurrent Spare Part), not only availability but also cost, and developed the program enabling run in WINDOW OS. By considering multi-step repair and logistics support system, repairing capability at the time of deployment, and procurement period, this model is the first local model reflecting circumstances of the armed forces of the Republic of Korea. Furthermore, the programmed model was selected as the military standard software and has being essentially used for CSP calculation.
        4,600원
        3.
        2006.10 KCI 등재 구독 인증기관 무료, 개인회원 유료
        The Cost has been much emphasized in inside of an army because of the promotion of reconciliation atmosphere between South and North Korea and the reduction of defense budget since 1990. So we are now faced with the problem that we should consider a cost above all besides the performance and arrangement for such a restriction of budget in time of developing new generation weapon systems. In this research we are suggested following two methodologies. One is the develop a weapon system with optimum cost considering a Life Cycle Cost from the first stage of design and the other is the cost control and management with the establishment of Target cost.
        4,000원