검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 2

        1.
        2018.04 KCI 등재 구독 인증기관 무료, 개인회원 유료
        For performance analysis of flood prevention projects, this study performed simulation (SWMM) for the five sites where the projects have been completed. The models were constructed using watershed and sewer information of the project sites and were verified using flood records in the past to improve accuracy. In this simulation, the design rainfall data (probability 30~50 years) and the rainfall data in the summer of 2017 were applied. When the design rainfall data was applied to the models, simulation results presented that all the sites were flooded before the projects, but after the projects all the sites were not flooded due to improve discharge capacity. And when the rainfall data in the summer of 2017 was applied to the models, simulation results presented that all the sites were flooded before the projects, but after the projects any sites did not occur flooding in this summer. So if the projects had not been completed, all the sites might be flooded in the summer of 2017. These effects were analyzed as the improvement of discharge capacity due to rehabilitation of sewer, construction of underground tunnel and pumping station, etc. As the results, ratio of sewer that water depth exceed diameter reduced from 52.3~75.8% to 17.1~39.8%.
        4,500원
        2.
        2017.02 KCI 등재 구독 인증기관 무료, 개인회원 유료
        For economic evaluation of integrated operation to sewage facilities, benefit-cost analysis was performed to watershed sewage works project in 7 watershed areas, 156 facilities. In this study, the cost before and after integrated operation was compared and benefits are calculated from the reduction of operators, increasement treated pollution loads, reduction cost through operation convenience, reduction water consumption through effluent reuse, and improvement of life benefit. The result showed that cost was 8,500million won and benefit was 16,747million won, so benefit was 49% higher than cost. B/C analysis result showed that B/C ratio was 1.97 and it is similar to other researches. The benefits of integrated operation included convenience of data management, increase of emergency response, decrease of complains with sewage which was not reflected numerically, so the benefits of integrated operation were expected much greater than this result.
        4,000원