검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 5

        1.
        2020.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Up to date cosmetic OEM/ODM (original equipment manufacturing/original development manufacturing) industry receives attention as a future growth engine due to steady growth. However, because of limited research and development capability, many companies have employed commercial management platforms specialized for large-sized companies; thus, overall system effectiveness and efficiency is low. Especially, MRP (material requirement planning) system introduced originally in 1970s is employed to calculate the requirement of the parts. However, dynamic nature of production lead time usually results in incorrect requirements. In addition, its algorithm does not consider the capability of the production resources. Also, because the commercial MRP system calculates all subcomponent for fixed period, the more goods have subcomponent, the slower calculation is. Therefore, conventional MRP system cannot respond complicated situation in time. In this study, we will suggest a new method that can respond to complicated situations resulting from short lead time and urgent production order in Korean cosmetic market. In particular, a distributed MRP system is proposed, that consists of multi-functional and operational modules, based on the characteristic of the BOM (bill of material). The distributed MRP system divides components (i.e. products and parts) into several fields and decrease the problem size; thus, we can respond to dynamically changed data any time. Through this solution, we can order components quickly, adjust schedules and planned quantity, and manage stocks reasonably. In addition, a prototype of the distributed MRP system is presented in this paper, in which ERP (enterprise resource planning) sever data is associated with an excel spreadsheet via MSsql. System user interface is implemented by a VBA (visual basic for applications) tool. According to a case study, response rate for delivery and planning achievement rate were enhanced about 20%, and inventory turnover was also decreased. Consequently, the proposed system improves overall profit.
        4,000원
        4.
        2009.09 구독 인증기관 무료, 개인회원 유료
        Changing Proteins in Granulosa Cells during Follicular Development in Pig In-Soon Chae1, Dong-Min Jang3, Hee-Tae Cheong2, Boo-Keun Yang1 and Choon-Keun Park1,† 1College of Animal Life Sciences, 2School of Veterinary Medicine, Kangwon National University, Chuncheon 200-701, Korea 3CHA Stem Cell Institute, CHA Hospital, Seoul 463-712, Korea ABSTRACT This study analyzed change of proteins in granulosa cells during the porcine follicuar development by proteomics techniques. Granulosa cells of the follicles, of which the diameter is 2~4 mm and 6~10 mm, were collected from ovary of slaughtered pig that each follicle of diameter 1~4 mm and 6~10 mm. We extracted glanulosa cell proteins by M-PER Mammalian Protein Extraction Reagent. Proteins were refined by clean-up kit and quantified by Bradford method until total protein was 200 μl. Immobilized pH gradient(IPG) strip used 18 cm, 3~10 NL. SDS-PAGE used 10% acrylamide gel. After silver staining, Melanie 7 and naked eye test were used for spot analyzation. Increasing proteins in glanulosa cell of 6~10 mm follicle were 7 spots. This spots were analyzed by MALDI-TOF MS and searched on NCBInr. In results, 7 spots were similar to zinc/ling finger protein 3 precursor (RING finger protein 203), angiomotin, heat shock 60 kDa protein 1 (chaperonin) isoform 1 (HSP60), similar to transducin-like enhancer protein 1 (TLE 1), SH3 and PX domains 2A (SH3PXD2A). Those proteins were related with transfer between cells. Increase of proteins has an effect on follicular development.
        4,000원