검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 6

        1.
        2023.11 구독 인증기관·개인회원 무료
        Korea Atomic Energy Research Institute (KAERI) has been operating the Post Irradiation Examination Facility (PIEF) for fuel examinations. The facility has pools and hot cells for handling and examining fuel assemblies and rods. Among the hot cells, the second cell is for measuring rod internal pressure (RIP) and then cutting the rod to make samples for destructive tests. Currently, the cutting machine is broken, so it has to be replaced. Because the existing cutting machine consists of many parts and its size was quite a bit large to handle and treat for the radioactive waste disposal, the disassembly work has been performed to make it smaller using manipulators. The drawings of the cutting machine were reviewed and the disassembly tools were developed considering workability when the work performed at the hot cell using the manipulators. The large parts such as motor, mirror and cable, etc., were able to be disassembled and the machine size became so smaller that it could be easily handled for the disposal.
        2.
        2023.05 구독 인증기관·개인회원 무료
        In case of damaged spent fuels, it would require additional treatment for their transportation and storage to capture the radioactive fission products in a defined space. The canning container for the damaged spent fuels is one way to seal the radioactive fission products inside the container. In the Post Irradiation Examination Facility (PIEF) of KAERI, the Quiver container has been introduced for canning damaged spent fuels from Westinghouse Sweden. The main container body has been manufactured for particle-tightness of spent fuel. In addition, drying equipment is being prepared for gas-tightness of spent fuel. The drying equipment can remove water and fill the inert gas inside the container. Before drying inside the container, we evaluated the volatile fission products inventory because volatile fission products could be released during the drying process. Despite assuming highly conservative hypotheses for the inventory remaining in damaged fuel rods, the amount that could be released during the drying process was less and dose rate levels around the evacuation piping system were low.
        3.
        2022.10 구독 인증기관·개인회원 무료
        The skeleton of fuel assembly is composed of top nozzle, bottom nozzle, grids, and guide tubes. In the reactor core, all the parts of the fuel assembly suffer degradations due to the condition of high temperature, pressure and water environment. Therefore, many material properties of high temperature mechanical strength, corrosion and irradiation resistance have been considered to choose the material for fuel assembly parts in the fuel development stage. The guide tubes have important roles to connect each parts and support the load of fuel assembly while the fuel is lifted. In Westinghouse 14×14 standard fuel assembly, Zircaloy-4 was used for the material of the guide tubes. Zircaloy-4 has a resistance to water corrosion and maintain good mechanical properties after the discharge from the core, so this alloy is also utilized for a fuel rod cladding material although the microstructure is slightly different due to the heat treatment difference. Thus, it is expected that there is no issue regarding the guide tube integrity after the discharge and during the storage in the pool, especially in case of low burn-up. However, the surface oxidation and resultant hydrogen pick-up can affect to the embrittlement to the Zr alloy. So, it is needed to know the actual status of spent fuel assembly by performing post-irradiation examination. In this study, the degradation level of the guide Tubes in low burn-up spent fuel assembly was investigated using the KAERI PIE facility in order to make some data which can be utilized to the baseline for evaluating the integrity of the spent fuel skeleton.