Recently, elevator inspection and self-examination were strengthened through the revision of the Elevator Safety Management Act, but there have been no significant reduction in serious accidents and major failures. Therefore, the government intends to lay the foundation for reflecting the safety quality rating system, which adjusts the elevator inspection cycle, as a policy to induce safety management of preemptive and active management entities. This study systematically reviewed and classified the safety quality rating system for elevator inspection cycle adjustment in previous studies, collected expert opinions, and reconstructed the key items into realistic evaluation items, and evaluated and scored the relative importance of each factor through the AHP technique.
This research is significant in terms of estimating the validity by setting evaluation items in view of integrating not only original beauty and visual areas but also natural ecological areas based on questionnaire. The results are as follows. 1) According to literature study, 17 items such as variety, the character of sites in terms of landscape, the beauty of landscape, visibility, and ratio of green visibility are selected. Also, 21 items such as variety of animals and plants species, size of green area, and ecological naturalness are selected in the area of landscape ecological resources. 2) As a result of questionnaire of the group of landscape experts, animals and plants ecological areas show 5.6341, the highest in importance analysis according to assessment areas. Also, as a result of importance analysis on items in each area, for example, in the area of visual resources, the item of skyline analysis is 6.0488, the highest. 3) As a result of corelation of item meaning on landscape effect assesment, for example, meaningness of psychological assessment item and landscape site item indicate 0.710, the highest coefficient correlation. 4) As critical assessment items per unit project, items such as damage minimization of original land features for project in terms of point, ratio of green visibility, variety of animals and plants species marked above 8.0 as high important medium. The project in terms of line, minimization of original land features, preservation of worthy biotope showed high point and the character of sites in terms of landscape, minimization of original land features, the size of green area, and analysis of skyline marked above 8.5 as high importance points. On the contrary, items for climate and soil showed relatively low points.
In large scale complex system such as a nuclear power plant, it is important to select guidelines and/or checklist to evaluate the system performance, especially human performance for visual information while the number of evaluation items of the guidelin
Evaluation items were deducted by based on literature materials to supplement the evaluation system of rock cut-slope in national road. Delphi survey of experts were conducted to review the final evaluation items. As a result of reviewing the significance through stepwise multiple linear regression, all of deducted items were statistically significant because these had lower P-value than 0.05. And It was confirmed that the items were selected appropriately as they had relatively similar levels of the weight.
This study was performed to select the performance-based evaluation items of concrete retaining wall. This study used Delphi Technique. As a result of survey, this study gained 17 condition assessment items and 7 safety evaluation items at final round. The results will be utilized as the basis for the performance-based evaluation.
This study aims to develop a rational evaluation system which consists of the selection of evaluation items and the estimation of its weight for the Enhancement Program of the Quality of Life for Farmers and Fishermen and Rural Development. This system has two hierarchical steps. The first step shows the evaluation goals which are relevance, efficiency and effectiveness of the program. The second step stands for the evaluation items which have 11 sub-items such as necessity and externalization for the program, rationality of procedures, feedback and monitoring system, budgetary allocations, information activities, impacts on the program, achievements of the goals and so on. A tentative evaluation system was proposed by brainstorming and Delphi method of expert-group. Weighting values of evaluation items were calculated through pair-comparison works of expert group using stepwise matrix sheets by AHP(Analytic Hierarchy Process).