Recently, because people are taking a great interest in the water supply system and the related facilities are getting larger, the surge suppression is very important problem. The waterhammer occurs when the pumps are started or stoped for operation or tripped due to the power failure. As the waterhammer problems as a result of the pump power failure were very serious, these situations were carefully investigated. Accordingly, we carried out both numerical simulations to confirm the safety fot the intergrated operating of 1st stage and 2nd stage Juam intake pumping station in which had the in-line pumps. In this paper, it was reviewed that the water supply system has the reliability on the pressure surge, in case the air chambers were installed at both the inlet and the oulet of the in-line pumping station. we are sure that Juam intake pumping station in which have the air chambers is safe for the waterhammer.
Recently, because pepople are taking a great interest in the water supply system and the related facilities are getting larger, the surge suppression is very important problem. Accordingly, We carried out both numerical simulation and field tests to confirm the safety of intake pumping station.
본 연구에서는 상수관망의 비정상 상태 흐름을 해석하기 위하여 파속조절법을 이용하여 관망해석모형을 개발하였다. 특성선법을 이용한 실제 상수관망에서의 부정류 해석시 다양한 경계조건의 존재로 인해 해석과정이 매우 복잡하게 된다. 이러한 특성선법 해석의 어려움을 극복하고자 보다 간단하고 정확하게 경계조건을 처리할 수 있는 기법을 도입하였고 외부 유출 유량을 직접적으로 해석할 수 있는 방정식을 유도하였다. 또한 유도된 방정식을 이용하여 수격해석 모형을 개발하였으