        1.
        2023.11 구독 인증기관·개인회원 무료
        KHNP is conducting research to decommission Wolsong Unit 1 Calandria. Establishment of preparation and dismantlement processes, conceptual design of equipment and temporary radiation protection facilities, and waste management are being established. In particular, the ALARA plan is to be established by performing exposure dose evaluation for workers. This study aims to deal with the methodology of evaluating exposure dose based on the calandria dismantling process. The preparation process consists of bringing in and installing tooling and devices, and removing interference facilities to secure work space. The main source term for the preparation process is the calandria structure itself and crud of feeders. In the case of the dismantlement process, a structure with a shape that changes according to the process was modeled as a radiation source. It is intended to estimate the exposure dose by selecting the number of workers, time, and location required for each process in the radiation field evaluated according to the preparation and dismantlement process. In addition, it is also conducting an evaluation of the impact on dust generated by cutting operations and the human impact of C-14, H-3, which are specialized nuclides for heavy water reactors. KHNP is conducting an exposure dose evaluation based on a process based on the preparation and dismantlement process for decommissioning Calandria through computation code analysis. If additional worker protection measures are deemed necessary through dose evaluation according to this methodology, the process is improved to prepare for the dismantling of worker safety priorities.
        2.
        2023.11 구독 인증기관·개인회원 무료
        Wolsong Unit 1 nuclear power plant, which was permanently shut down in 2019, has a 678 MWe calandria vessel of the CANDU-6 type pressurized heavy-water reactor model. The calandria inside the vault is a horizontal cylindrical vessel made of stainless steel with a length of 7.8 m and a thickness of 28.6 mm. For the entire dismantling processes of a nuclear power plant, dismantling works cannot be performed using only one cutting technology and method, and when performing dismantling of a calandria vessel, various systems and components can be used for cutting and dismantling. The calandria vessel is located in a concrete compartment called a vault, and in order to safely dismantle the calandria vessel, the spread of radioactive contaminants from inside of the vault to the outside must be prevented. We designed dismantling processes using the laser cutting method to dismantle the calandria vessel and end shields. We must minimize the risk of internal radiation exposure to workers from aerosols derived from the thermal cutting processes. Therefore, we need a way to prevent secondary contamination from spreading outside the vault and within the reactor building. The path through which radioactive contaminants move is that the flying airborne products generated during the cutting process inside the vault where the calandria is located do not stay in place but spread outward through the opening of the RM-Deck structure at the top. Therefore, facilities or devices are needed to effectively prevent the spread of radioactive contaminants by blocking the expected movement path. By using these facilities or devices, it is possible to prevent the movement of radioactive aerosol particles between the location of the worker and the location of the cutting area where the calandria is located, thereby preventing internal exposure through the worker’s breathing. In addition, by using these, the cutting area where airborne pollutants are generated can be designed as an isolated work space to prevent the spread of radioactive contaminants. In this study, we propose a method of facilities for confining radioactive aerosol particles and preventing the spread of contamination when thermal cutting of the calandria vessel within the vault.
        3.
        2022.05 구독 인증기관·개인회원 무료
        Wolsong unit 1 (W1), which is a CANDU-6 type PHWRs that had been operated for 30 years since 1983, was shutdown in 2019. In this study, the radioactive waste levels of calandria and concrete structures were calculated to establish a decommissioning plan for W1. The specific systems within the scope of this study were grouped into 6 major categories as follows: Calandria, End Shield, Fuel Channel Assembly, Reactivity Control Device, End Shield Support, Vault. The main operating history of W1 is that the re-tubing project was performed. These characteristics and operation history were reflected in the evaluation. The neutron flux and energy spectrum of each structure were calculated by using MCNP code, and ORIGEN code is implemented to the calculation of radioactivity for each nuclide using the results from MCNP and the material information of the structure. As for the impurity information, ASTM B350, B351, B353 standard was used for zircaloy alloy. For other alloy, impurity information provided by NUREG/CR-3474 was applied. Since W1 is expected to be decommissioned immediately, the waste level was evaluated under cooling conditions for 5 years after permanent shutdown. Through the level evaluation of each component obtained as a result of the study, it can be used as basic data for the radioactive waste management of the decommissioning plan.