검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 47

        1.
        2024.09 KCI 등재 SCOPUS 구독 인증기관 무료, 개인회원 유료
        Kori Unit 1, the first commercial nuclear power plant (NPP) in Korea, was permanently shut down in 2017 and was scheduled for decommissioning. Various programs must be planned early in the decommissioning process to safely decommission NPPs. Radiological characterization is a key program in decommissioning and should be a high priority. Radiological characterization involves determining the decommissioning technology to be applied to a nuclear facility by identifying the radiation sources and radioactive contaminants present within the facility and assessing the extent and nature of the radioactive contaminants to be removed from the facility. This study introduces the regulatory requirements, procedures, and implementation methods for radiological characterization and proposes a methodology to link the results of radiological characterizations for each stage. To link radiological characteristics, this study proposes to conduct radiological characterization in the decommissioning phase to verify the results of radiological characterization in the transitional phase of decommissioning NPPs. This enables significantly reducing the scope and content of radiological characterization that must be performed in the decommissioning phase and maintaining the connection with the previous phase.
        4,600원
        12.
        2023.11 구독 인증기관·개인회원 무료
        South Korea’s first commercial nuclear reactor, Kori Unit 1, was permanently shut down in 2017, and preparations are currently underway for its decommissioning. After the permanent shutdown, the spent nuclear fuel from the reactor core is removed and stored in a spent fuel storage facility. Subsequently, steps are taken for its permanent disposal, and if a permanent disposal site is not determined, it is stored in an interim storage facility (or temporary storage facility). Therefore, the activation criteria for radiation emergency plans vary depending on the movement of spent nuclear fuel and the storage location. In this study, it reviewed emergency plans in the U.S. NRC Regulatory Guide (Draft) titled ‘Emergency Planning for Decommissioning Nuclear Power Reactors’ to determine the requirements for radiation emergency plans needed for decommissioned nuclear power plants. Additionally, by examining emergency plans applied to decommissioning nuclear power plants in the United States, this study identified emergency plan requirement that could be applicable to future decommissioned nuclear power plants in South Korea. This study will contribute to the establishment of appropriate radiation emergency plans for decommissioning nuclear power plants in Korea for providing accurate information on overseas cases and relevant guidelines.
        13.
        2023.11 구독 인증기관·개인회원 무료
        The Korea Research Institute of Standards and Science has developed certified reference materials (concrete, soil, and metal radioactive liquid) for measuring gamma-emitting radionuclides to improve and maintain the quality assurance and quality control of the radioactivity measurement in decommissioning nuclear power plants. The raw materials that make up each CRM were mixed in an appropriate ratio with radionuclides. For certification and homogeneity assessment, 10 bottles were randomly selected, two sub-samples were collected from each bottle, and radionuclides were measured via HPGe gamma spectrometry. The results of the homogeneity tests using a one-way analysis of variance on the radionuclides in the CRMs fulfilled the requirements of ISO Guide 35. Coincidence summing and self-absorption correction were performed on measurement results by introducing the Monte Carlo efficiency transfer code and Monte Carlo N-Particle transport code. In concrete analysis, the reference values for five radionuclides (60Co, 241Am, 134Cs, and 137Cs) in the CRM were in the range of 15-40 Bq/kg, and the expanded uncertainty was within 10% (k = 2). In soil analysis, the reference values for the 137Cs and 60Co were 118.7 and 124.4 Bq/kg, and the expanded uncertainty was within 10% (k = 2). In metal radioactive liquid analysis, the reference values for 134Cs, 137Cs and 60Co in the CRM were in the range of 200-270 Bq/kg, and the expanded uncertainty was within 7% (k = 2).
        14.
        2023.09 KCI 등재 SCOPUS 구독 인증기관 무료, 개인회원 유료
        The Radiation and Decommissioning Laboratory of Central Research Institute (CRI) of Korea Hydro and Nuclear Power Co. (KHNP) performs research to technically support the effective management of radiological hazards to avoid risks to civilians, the workers, and the environment from the radiological risks. The laboratory mainly consists of three technical groups: decommissioning and SF technology group, radiation and chemistry group, and radwaste and environment group. The groups carry out various R&D such as decommissioning, spent fuel management, radiation protection, water chemistry management, and radioactive waste management. The laboratory also technically supports the calibration of radiometric instruments as a Korea Laboratory Accreditation Scheme (KOLAS), approval for decommissioning, guidance for radioactive waste management, state-of-the-art technology evaluations, and technology transfer.
        4,000원
        15.
        2023.05 구독 인증기관·개인회원 무료
        One aspect of securing safety from the operation of Nuclear Power Plants (NPPs) is to evaluate the impact on residents at the facility’s exclusive area boundary to confirm that the radiological risk is below the allowable level. Normally, the risks from gaseous and liquid effluents are evaluated during the operation of facilities. Meanwhile, in order to be approved for the decommissioning plan, the environmental risks caused by activities during dismantling is also evaluated. Therefore, this study aims to investigate the exposure pathways considered in evaluating the risks to nearby residents from the operation and decommissioning of nuclear facilities and to examine the differences. The emission rate by radionuclide is calculated by evaluating the amount of leak from nuclear fuel during the operation of the facility through design data of the NPP. Each of the liquid and gaseous effluents is calculated, and the exposure dose received by nearby residents is calculated by considering the exposure pathways with these emission rates. In order to initiate the decommissioning of nuclear facilities, approval of the Final Decommissioning Plan (FDP) must be obtained. The FDP chapter shall describe the results of the environmental impact assessment of the decommissioning. It will not differ significantly in the exposure pathways during operation. However, the decommissioning of nuclear facilities is ultimately to remove Systems, Structures, and Components (SSCs) and to remove the regulation of the Nuclear Safety Act by ensuring that sites and remaining buildings meet the criteria for the license termination. In terms of release and reuse of nuclear facilities, the exposure dose to be considered in evaluating the dose can be considered for two main types: the site and the remaining building. The factors affecting the exposure pathways considered in assessing the environmental impacts considered in the operation and decommissioning of nuclear facilities are due to gaseous and liquid effluents. However, the difference should reflect the impact of NPP operations and decommissioning activities when evaluating the amount of radionuclides released by these effluents. Decommissioning should consider the impact after decommissioning, which is the effect of the receptor by radionuclides remaining on the site and in the remaining buildings. At this time, the effects of the source from the soil and the source from the surface of the building should be considered for the external and internal exposure pathways.
        16.
        2023.05 구독 인증기관·개인회원 무료
        The decommissioning of the Nuclear Power Plant (NPP) is a long-term project of more than 15 years and will be carried out as a project, which will require project management skills accordingly. The risk of decommissioning project is a combination of many factors such as the decommissioning plan, the matters licensed by the regulatory agency, the design and implementation of dismantling, the dismantling plan and organization, and stakeholders. There will be some difficulties in risk management because key assumptions about many factors and the contents of major risks should be well considered. Risk management typically performs a series of processes ranging from identification and analysis to evaluation. In order to analyze and evaluate risks here, identification of potential risks is the first step, and in order to reasonably select potential risks, various factors mentioned should be considered. Therefore, the purpose of this study is to identify possible risks that should be considered for the decommissioning project in various aspects. The risk of the decommissioning project can be defined using the hazard keyword, and the risk family presented in the IAEA safety series can also be referred. It would be better to approach the radiological or non-radiological risks that may occur in the dismantling work with the hazard keyword, and if the characteristics of the decommissioning project are reflected, it would be a good idea to approach it on a risk family basis. There are 10 top risks in the risk family, 25 risks at the level 2 and 61 risks at the level 3 are presented. It may be complex to consider these hazards and risks recommended as risk families at the same time, so using the results of safety evaluation as input data for risk identification can be a reasonable approach. Therefore, this study intended to derive the possible risks of the decommissioning project based on the risk family structure. At this point, the reflection of the safety assessment results was intended to be materialized by considering the hazards checklist. As a result, this study defined and example of 38 possible risks for the decommissioning project, considering the 10 top risk family and lower level risk categories. This result is not finalized, and it will be necessary to further strengthened through expert workshops or HAZOP in the future.
        17.
        2023.05 구독 인증기관·개인회원 무료
        To evaluate the characteristics of radioactive waste from permanently shut down nuclear power plants for decommissioning, there is a method of directly analyzing samples and, on the other hand, a computerized evaluation method based on operation history. Even if the radioactivity of the structures or radioactive wastes in the nuclear power plant is analyzed by the computerized evaluation method, a method of directly analyzing the sample must be accompanied in order to more accurately know the characteristics of the nuclear power plant’s radioactive waste material. In order to obtain such samples, we need a way to collect materials from radioactive waste. However, in the case of a permanently shut down nuclear power plant with a long operating history, human access is limited due to radiation of the material. In this study, we propose a method of remotely collecting samples that guarantees radiation protection and worker safety at the site where radioactive waste is located.
        18.
        2023.05 구독 인증기관·개인회원 무료
        The nuclear power plant decommissioning project inevitably considers time, cost, safety, document, etc. as major management areas according to the PMBOK technique. Among them, document management, like all projects, will be an area that must be systematically managed for the purpose of information delivery and record maintenance. In Korea, where there is no experience in the decommissioning project yet, data management is systematically managed and maintained during construction and operation. However, if the decommissioning project is to be launched soon, it is necessary to prepare in consideration of the system in operation, what difference will occur from it in terms of data management, and how it should be managed. As a document that can occur in the decommissioning project, this study was considered from the perspective of the licensee. Therefore, the types of documents that can be considered at Level 1 can be divided into (1) corresponding documents, (2) project documents, (3) internal documents, and (4) reference materials. Four document types are recommended based on Level 1 for the classification of documents to be managed in the decommissioning of nuclear facilities. In this study, documents to be managed in the decommissioning project of nuclear facilities were reviewed and the type was to be derived. Although it was preliminary, it was largely classified into major categories 1, middle categories 2, and 3 levels, and documents that could occur in each field were proposed. As a result, it could be largely classified into corresponding documents, project documents, internal documents, and reference materials, and subsequent classifications could be derived. Documents that may occur in the decommissioning project must be managed by distinguishing between types to reduce the time for duplication or search, and the capacity of the storage can be efficiently managed. Therefore, it is hoped that the document types considered in this study will be used as reference materials for the decommissioning project and develop into a more systematic structure.
        19.
        2023.05 구독 인증기관·개인회원 무료
        The domestic Nuclear Power Plant (NPP) decommissioning project is expected to be carried out sequentially, starting with Kori Unit 1. As a license holder, in order to smoothly operate a new decommissioning project, a process in terms of project management must be well established. Therefore, this study will discuss what factors should be considered in establishing the process of decommissioning NPPs. Various standards have been proposed as project management tools on how to express the business process in writing and in what aspects to describe it. Representatively, PMBOK, ISO 21500, and PRICE 2 may be considered. It will be necessary to consider IAEA safety standards in the nuclear decommissioning project. GSR part 6 and part 2 can be considered as two major requirements. GSR part 6 presents a total of 15 requirements, including decommissioning plans, general safety requirements until execution and termination. GSR part 2 presents basic principles for securing the safety of nuclear facilities, and there are a total of 14 requirements. Domestic regulatory guidelines should be considered, and there will be largely laws and regulations related to the decommissioning of nuclear facilities, guidelines for regulatory agencies, and guidelines and regulations related to HSE. The Nuclear Safety Act, Enforcement Decree, Enforcement Rules, and NSSC should be considered in the applicable law for nuclear facilities. Since the construction and operation process has been established for domestic decommissioning project, there will be parts where existing procedures must be applied in terms of life cycle management of facilities and the same performance entity. As a management areas classification in the construction and operation stage, it seems that a classification similar to Level 1 and Level 2 should be applied to the decommissioning project. This study analyzed the factors to be considered in the management system in preparing for the first decommissioning project in Korea. Since it is project management, it is necessary to establish a system by referring to international standards, and it is suggested that domestic regulatory reflection, existing business procedures, and domestic business conditions should be considered.
        20.
        2023.05 구독 인증기관·개인회원 무료
        Metal waste generated during the dismantling of a nuclear power plant can be contaminated with radionuclides. In general, the internal structure is very complex. Thus, metal waste requires various cutting processes. When metal waste is cut, aerosols are generated. Aerosols are generally various particles of very small size suspended in the working area and remain for a considerable period. This may cause internal exposure of workers due to inhalation of radioactive aerosols generated when cutting radioactive metal waste. This study investigated various cutting processes and the size distribution of aerosols generated during the cutting process. The cutting process is normally classified into thermal cutting, mechanical cutting, and laser cutting. Thermal cutting includes plasma, flame, and oxygen cutting. Mechanical cutting includes mechanical saws, cutters, nibblers, and abrasive water jets. Stainless steel, carbon steel, aluminum, and copper are commonly used as cutting materials in nuclear power plants. The size of the aerosol generated from cutting showed a very diverse distribution depending on the cutting methods and cutting materials. In general, aerosol size is distributed within 0.1-1 μm. This size distribution is different from the 5 μm aerosol size suggested by the ICRP Publication 66 Lung model. These results show that it is necessary to conduct further studies on the size of aerosols generated when decommissioning nuclear power plants.
        1 2 3