PURPOSES : This study aims to examine the differences between the existing traffic demand forecasting method and the traffic demand forecasting method considering future regional development plans and new road construction and expansion plans using a four-step traffic demand forecast for a more objective and sophisticated national highway maintenance. This study ultimately aims to present future pavement deterioration and budget forecasting planning based on the examination. METHODS: This study used the latest data offered by the Korea Transport Data Base (KTDB) as the basic data for demand forecast. The analysis scope was set using the Daejeon Metropolitan City’s O/D and network data. This study used a traffic demand program called TransCad, and performed a traffic assignment by vehicle type through the application of a user equilibrium-based multi-class assignment technique. This study forecasted future traffic demand by verifying whether or not a realistic traffic pattern was expressed similarly by undertaking a calibration process. This study performed a life cycle cost analysis based on traffic using the forecasted future demand or existing past pattern, or by assuming the constant traffic demand. The maintenance criteria were decided according to equivalent single axle loads (ESAL). The maintenance period in the concerned section was calculated in this study. This study also computed the maintenance costs using a construction method by applying the maintenance criteria considering the ESAL. The road user costs were calculated by using the user cost calculation logic applied to the Korean Pavement Management System, which is the existing study outcome. RESULTS : This study ascertained that the increase and decrease of traffic occurred in the concerned section according to the future development plans. Furthermore, there were differences from demand forecasting that did not consider the development plans. Realistic and accurate demand forecasting supported an optimized decision making that efficiently assigns maintenance costs, and can be used as very important basic information for maintenance decision making. CONCLUSIONS : Therefore, decision making for a more efficient and sophisticated road management than the method assuming future traffic can be expected to be the same as the existing pattern or steady traffic demand. The reflection of a reliable forecasting of the future traffic demand to life cycle cost analysis (LCCA) can be a very vital factor because many studies are generally performed without considering the future traffic demand or with an analysis through setting a scenario upon LCCA within a pavement management system.
As competition in manufacturing enterprise is contested, the scope of safely production planning, manufacturing enterprise should ensure, has been reduced. The more upstream of SCM, the more reduction of scope of production planning. As a result, order fluctuation is more sharply contested. Through improving the logistics network, it is best way that the end user's demand information is conveyed to upstream of SCM, but it is difficult in fact. In this paper, it mention the way of robustic adjustment, in the suppliers' point of view, the end user's demand information is dammed up, as they postpone responding the customer's order as a possible. And it will show the result of appling the way, as a case study.
The company was focusing on production which was partial mission rather than acquiring the information of customer in intensive process industry. The company accepted loss which is from over-production, losing of opportunity. After changing to web environment, supply chain is more complicated and need of customer is more various. As a result the company hard works on controlling production rates, production quantities in production area and gathering exact information which is about available resource and available quantities. Cooperated demand planning have to get decreasing of inventory, improving of customer service in supply chain management. Specially demand planning that considers allocation of capacity is executed in Iron-Industry. Demand planning must be classified by customer, region and supply position level.
The company was focusing on production which was partial mission rather than acquiring the information of customer in intensive process industry. The company accepted loss which is from over-production, losing of opportunity. After changing to Web environment, supply chain is more complicated and need of customer is more various. As a result the company hard works on controlling production rates, production quantities in production area and gathering exact information which is about available resource and available quantities. Cooperated demand planning have to get decreasing of inventory, improving of customer service in supply chain management. Specially demand planning that considers allocation of capacity is executed in Iron-Industry. Demand planning must be classified by customer, region and supply position level.
The comparison of demand and supply is needed for efficient ecosystem services planning. However, the gap between them cannot be analyzed as existing studies mainly dealt with only the supply of ecosystem services. This study compares the demand and supply of ecosystem services in Shiheung using environmental complaints and urban planning by semantic network analysis. As a result, ‘air’ and ‘water’ quality are magnified in demand, ‘energy’ and ‘water’ are crucial in supply. This result presents that citizen ask for the improvement of air quality in regulation services, although local government has plans for energy support in provisioning services. Periodic ecosystem services demand and supply monitoring will be the base of effective ecosystem services planning, which reduce insufficiency and surplus.