The purpose of this study is to present a method that can estimate the height of reaction facilities for large structural experiment through load flow as primary design procedure. The characteristic of the load transmission according to the type of experiment was analyzed to obtain tensile and compressive forces occurring on the reaction facilities. Strong walls that are affected by the bending moment is applied the post-tensioning method, and the strong floor under the control of the tension and compression is designed in accordance with the load flow. And the optimum cross-section of the reaction facilities was obtained by comparing the stresses of the tensile stress and crack the concrete. Through validating elastic analysis, the design results were satisfied a given design conditions.
The TMDL (Total Maximum Daily Load) has been used to determine the water quality target. LDC (Load Duration Curve) based on hydrology has been used to support water quality assessments and development of TMDL. Also FDC (Flow Duration Curve) analysis can be used as a general indicator of hydrologic condition. The LDC is developed by multiplying FDC with the numeric water quality target of the factor for the pollutant of concern. Therefore, this study was to create LDC using the stream flow data and numeric water quality target of BOD and T-P in order to evaluate the pollutant load characterization by flow conditions in Heukcheon stream. When it is to be a high-flows condition, BOD and T-P are necessary to manage. BOD and T-P did not satisfy the numeric water quality target for both seasons (spring and summer). In order to meet the numeric water quality target in Heukcheon stream, management of non point source pollutant is much more important than that of point source pollutant control.
The structure system that is discreterized by continuous shells is usually used to make a large space structures and these structures show the collapse mechanisms that are captured at over the limit load, and snap-through and bifurcation are most well known of it. For the collapse mechanism, rise-span ratio, element stiffness and load mode are main factor, which it give an effect to unstable behavior. Moreover, resist force of structure can be reduced by initial condition and initial imperfection significantly. In order to investigate the instability of shell structures, the finite deformation theory can be applied and it becomes a nonlinear mathematics in which use equation of tangential stiffness incrementally. With an initial imperfection, using simple example and Flow Truss Dome, the buckling characteristics of space truss is main purpose of this paper, and unstable behavior is studied by proposed the numerical method. Also, by using MIDAS, this research work analyzes displacements and inner forces as the design load of model, and the ratio of buckling load of design load is investigated.
The objective of this study is to evaluate Flow-Pollutant load delivery ratio equations developed from rural watershed on main subwatersheds within Juam Lake. Two regression equations for BOD and three equations for T-P were evaluated on Bosung cheon, Dongbok cheon, Songgwang cheon, Naenam cheon, and Sinpyeon cheon. The results show that estimation of BOD delivery ratio using flow-delivery equation is reliable when relative composition of discharge load of pollutant sources of a watershed is similar to those of watershed where the equation developed. On the other hand, application of regression equation for T-P was feasible when the landuse pattern and relative composition of discharge load of pollutant sources of a watershed is similar to those of watershed where the equation developed.
The objective of this study is to provide pollutant loads delivery ratio for flow duration in Oenam-cheon watershed, which is upstream watershed of Juam Lake. To calculate the delivery ratio by flow duration, rating curves and discharge-loads curves using measured data were established, then Flow Duration Curve(FDC) and pollutant loads delivery ratio curves were constructed. The results show that the delivery ratios for BOD5 for abundant flow(Q95), ordinary flow(Q185), low flow(Q275), and drought flow(Q355) were 23.9, 12.7, 7.1, and 2.9%, respectively. The delivery ratios of same flow regime for T-N were 58.4, 31.2, 17.2 and 7.1%, respectively. While, the delivery ratios T-P were 17.3, 7.5, 3.4, and 1.1% respectively. In general, delivery ratio of high flow condition showed higher value due to the influence of nonpoint source pollution. Based on the study results, generalized equations were developed for delivery ratio and discharge per unit area, which could be used for ungaged watershed with similar pollution sources.
본 연구에서는 부유입자를 포함하는 유동을 입자크기와 입자량을 달리한 몇 가지 경우에 대하여 수치적으로 해석하고 Coleman(1981, 1986)의 실험결과와 비교하였다. 완전 난류 유동장을 해석하기 위하여 k-난류모형을 사용하였으며, 농도장 해석을 위해서는 침강속도를 고려한 일반화된 농도방정식을 적용하였다. 유동과 입자의 상호작용은 Einstein과 Chien(1955)의 모형을 도입하여 수치계산하였다. 기존의 대부분 연구에서는 소유사의 두께를 고려하