검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 13

        2.
        2021.12 KCI 등재 SCOPUS 구독 인증기관 무료, 개인회원 유료
        The present multidisciplinary study, which is a nexus of engineering and political science, investigates how the modernization of Non-Strategic Nuclear Weapons (NSNWs) affects the IAEA safeguards system based on the likelihood of the use of nuclear weapons. To this end, this study examines the characteristics of modernized NSNWs using Monte Carlo techniques. The results thus obtained show that 10 kt NSNWs with a Circular Error Probability (CEP) of 10 m can destroy the target as effectively as a 500 kt weapon with a CEP of 100 m. The IAEA safeguards system shows that the Significant Quantity (SQ) of 1 of plutonium is 8 kg, a parameter that was established when strategic nuclear weapons were dominant. However, the results of this study indicate that in recent years, low-yield nuclear weapons such as NSNWs have been more strategically interesting than strategic nuclear weapons as NSNWs require less plutonium than strategic nuclear weapons. Therefore, we would like to conclude that reducing the SQ of plutonium can result in more robust safeguards and non-proliferation strategies.
        4,500원
        3.
        2020.02 KCI 등재 구독 인증기관 무료, 개인회원 유료
        최근 건설업계에서 설계시의 수량산출 및 예정공사비의 정확도에 대한 요구가 높아지고 있으며, 설계변경 시에 즉각적인 물량의 변화와 공사비의 변화를 파악하는 것이 중요한 이슈가 되고 있다. 또한, 수량과 공사비와 관련한 각종 소송들이 빈번하게 발생하면서 이를 해결하기 위한 방안으로 BIM기반의 물량산출 및 견적이 대안으로 등장하였다. 그러나 현재 BIM기반의 물량산출 및 견적은 2D 기반의 기존 방식보다 활용이 원활하지 못하다. 이는 물량산출 및 내역에 대한 국가적인 표준이나 기준이 마련되어 있지 못하고, 산출 작업자의 경험이 중요한 요소로 작용하기 때문이다. 하지만, 이는 견적의 관점이고 설계자의 관점에서 BIM을 이용한 즉각적이고 비 교적 정확도가 우수한 수량과 공사비의 파악이 예산에 맞는 설계를 진행하기 위하여 필요하다. 본 연구에서는 서울시 OO타운 생활관의 철근콘크리트 구조의 콘크리트, 철근, 거푸집의 수량을 사례로 2D기반의 설계수량과 BIM을 기반으로 한 계획설계, 실시설계 시의 수량과 실제 시공수량을 비교·분석하고 차이가 발생하는 원인을 분석하여 향후 설계자 관점에서 BIM기반의 수량산출에 도움이 되고자 하였다.
        4,000원
        4.
        2017.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        본 연구는 BIM 도입 효과를 극대화할 수 있는 현장 적용성 확보에 중점을 둔 철근콘크리트 골조공사의 BIM 견적모델 작성과 BIM기반 견적 업무 프로세스를 표준화한 가이드라인을 제시하는 것을 목적으로 한다. 이를 위하여 기존 지침 및 가이드라인의 BIM 견적모델 작성 범위 및 방식을 고찰하고, 철근콘크리트공사 수량산출·견적 지침 및 기준을 분석하며, 기존 견 적 방식과 BIM기반 견적 방식에 대해 비교분석한다. 이를 통하여 BIM기반 견적 업무의 표준 프로세스를 수립하고, 콘크리 트/거푸집/철근 견적모델의 작성 및 수량산출 기준을 도출하며, 철근콘크리트공사 BIM기반 수량산출 및 견적 업무의 성과 물 목록 및 양식을 제시한다. 본 연구를 통해 작성된 BIM 견적 가이드라인은 BIM기반의 새로운 기술환경에 대한 진입장벽 을 낮추고, 견적의 정확성 극대화를 통한 원가절감을 실현하며, BIM 업무와 건설산업의 생산성과 부가가치를 증대시켜, 궁 극적으로 건설사업 전 생애주기에서 생산되는 정보를 통합 관리할 수 있는 기반을 구축하고 BIM 생태계를 조성하는데 기여 할 것으로 기대한다.
        4,000원
        6.
        2017.10 구독 인증기관·개인회원 무료
        아스팔트 혼합물은 덤프트럭으로 운반․대기 중 단기노화(short-term aging: STA) 되므로 모든 현장혼합물은 STA후 포설된다. 따라서 실험실에서 현장에 포장된 아스팔트 혼합물의 각종 특성을 추정하려면 같은 재료로 반드시 STA 처리 후 공시체를 제조해야한다. 이것이 실험실 혼합물을 STA 처리하는 근본적인 이유이며, 실험실 STA 방법은 현장상태를 최대한 근사하게 모사(simulation) 토록 규정되어져야 한다. 그러나 국내는 물론 외국 기준도 이러한 근본적인 원리를 제대로 준수 하지 못하고 있어 기준에 제시된 대로 STA를 수행해서는 현장에 포장된 아스팔트 혼합물의 특성을 추정할 수 없다. 이를 해결하기 위한 한 가지 방법의 한 방법은 노화량(aging quantity: AQ) 모델링을 통하여 혼합물의 노화도를 추정하는 것이다. 밀입도 혼합물의 AQ 모델은 기존의 연구에 의하여 지수함수 식으로    와 같이 제시되었다. 하지만 SMA 혼합물은 바인더 함량이 높고 섬유제 등이 사용되어 밀입도와 다르므로 본 연구에서는 SMA에 대한 AQ 모델식을 개발하고 이로부터 단기노화 온도와 시간에 따른 노화도를 추정하는 연구를 수행하였다. 그러므로 본 연구의 목적은 SMA 혼합물의 단기노화도를 추정하기 위하여 기 개발된 AQ 모델을 SMA 혼합물에 적용하여 필요한 보정을 통해 SMA 혼합물의 AQ 모델로 노화도를 추정하는 방안을 제시하는 것이다. 노화도는 아스팔트 노화의 척도로는 가장 많이 쓰이는 절대점도(absolute viscosity: AV)를 이용하였으며 SMA 혼합물을 대상으로 하여 SMA 노화도 정립에 필요한 기초자료를 제시코자 한다.
        7.
        2016.10 KCI 등재 구독 인증기관 무료, 개인회원 유료
        최근에 각광받고 있는 3D BIM기반 철근 물량 산출 현황을 살펴보면 상용 BIM 도구들이 철근 모델링 기능을 제공하지만 그 기능을 이용해서 철근을 모델링하려고 하면 방대한 양의 모델링 시간이 소요가 되어 현재 실용적으로 사용할 수 있는 BIM 소프트웨어는 없다. 본 연구에서는 BIM 기반 설계 현업에서 실용적인 철근 물량 산출 프로세스를 정리 및 제시하고, 초기설계단계의 단면 정보가 없는 상태에서 기존의 2D방식에 비하여 보다 정확하게 기동, 보, 슬래브, 벽체의 철근 단면 정 보를 자동으로 배근해주는 프로그램인 Rebar Automatic Arrangement Program(이하 RAAP)을 개발하였다. 본 연구 결과는 건설프로젝트의 초기 설계단계에서 설계 진행상 구조 부재 단면 설계가 완료되지 않은 상태의 골조 물량 산출 시 적은 노력 으로 기존의 2D기반 방식보다 신뢰성을 향상시킨 물량을 산출할 수 있는 기술로 발전시키는데 의미가 있으며, 합리적인 초 기 설계단계의 물량 산출 프로그램을 구축할 수 있는 기초 연구로서 활용될 수 있을 것으로 기대된다.
        4,000원
        8.
        2010.03 구독 인증기관 무료, 개인회원 유료
        Recently expanding market for largely scale construction projects, cost management of construction project have been increasingly recognized as an important factor responsible for the project success. But public organizations have been continuously operating the same methods as before in cost estimating, so it raise an issue of reliability for estimated cost. Therefore, this study present a highly reliable model that makes preliminary estimates based quantity data in early design stage. it enables engineers to efficiently manage total cost of project as well as partial cost estimating. This study develop a model of database that is created with historical data conducted by government offices. The model proposed can estirnate a cost for RC Structure in schematic design stage, and it is applied to CBR+GA logics to explore best similar cases. In case of estimating methods used to previous research, it is based on actual cost data. Due to the cost estimating compensated by inflation rate vary in market economic conditions, it will follow as an inevitable consequence of reliability problem. It needs to find better way to ensure accuracy through quantity database. Also, This study has been conducted in attempts to verify the reliability of preliminary estirnation. It is checked for the feasibility of presented model with P-National Tax Service Project aside from the database.
        4,000원
        9.
        2009.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Lee[15] examined quantity discount contracts between a manufacturer and a retailer in a stochastic, two-period inventory model where quantity discounts are provided based on the previous order size During the two periods, the retailer faces stochastic(tru
        4,000원
        10.
        2009.09 구독 인증기관 무료, 개인회원 유료
        A prediction of construction cost in preparation for construction document is calculated in compliance with the unit cost in Public construction of korea. This eventually means that the reasonable construction cost of a building can't be determined before construction document phase cost of construction is settled and that the cost of construction is calculated inefficiently because of connection failing between cost management of detailed estimation and information. To improve those problems, therefore, Cost estimating model of structural building elements with approximate quantity survey method is suggested in this research. The model predict the amount of materials and the cost of construction on the basis of historical similar cases. In the direction of data analysis of this research, ratio statistics value is put to practical use to fit into the peculiarities of approximate estimate of each work trade on the basis of actual data amount of materials of historical cases. In addition, the construction phase is connected through the result of a approximate estimate sorted by elements, details work trade.
        4,000원
        12.
        2004.06 KCI 등재 구독 인증기관 무료, 개인회원 유료
        This study was conducted to examine contents of total acid and free amino acids in the Demi-glace with added quantity of Omija extracts. Firstly, The level of Total acid content of Demi-glace sauces was 1.08~1.89% and Omija extracts was 2.77~7.24%. The more Omija extracts added, there was the higher total acid contents. Sauces and extracts of 5% Omija was the highest. Secondly, Total free amino acids contents of control was 2518.52mg%, and Omija sauces was 2261.52~2894.14mg%. 2% Omija sauces was the highest among them. Hydroxyproline of total 34 free amino acids was the highest, and Glutamic acid 158.42mg%, Proline 78.90mg% was next in order. Arginine was the highest with 27.40~34.40mg% among 9 essential amino acids contents. Glutamic acid was the highest contents with 123.18~158.42mg%. Compared to control's(0.41mg%), Omija added group was 20.63~27.82mg% and it was the highest increase. While other 15 amino acid was analyzed, Hydroxyproline was the highest contents with 1,737.22~2,205.80mg%. Compared to control group(15.63mg%), proline was 57.01~78.90mg% Omija added group and it was increased with the highest contents. In essential amino acid, flavor enhancing amino acid and other amino acid were increased and the highest contents with 2% added Omija sauce. Thirdly, sensory characteristics of Demi-glace sauces based on overall preference, It was find that 2% added Omija was the best. 2% added was the best for color, flavor, taste, texture, overall acceptability(P〈.001). In terms of Demi-glace sauces' gender preference, male and female people liked 2% added Omija color, flavor, taste, texture, overall acceptability. It was find that there was no significant differences between male and female.
        4,200원
        13.
        2018.04 서비스 종료(열람 제한)
        BIM is an opportunity to implement construction IT. BIM has brought two changes. One is the change of geometric Information. It is the transition from 2D CAD to 3D model. The other is property changes. Requires conversion from data to information. This is a confergence of geometric information and attribute information, and BIM requires convergence in the construction work process. This study aims to present a method for activating BIM in Project management. The first task after the design is quantity take-off. The QTO is a process of converting the geometric information (Analog) into the attribute information (Digital). This QTO-database is important information that can be based on Project management. Therefore, it is necessary to construct information that is useful from QTO. It is WBS-CBS integrated information. BIM-based QTO refers to linkage between 3D model object and WBS-CBS. Through this study, we show the method of WBS-CBS integrated information based on BIM and show the applicability of BIM through actual case. This study is expected to be a basis for the successful implementation of BIM-based project management.